NSEAwarding of order(s)/contract(s)4d ago · 26 Aug 2026, 03:23 pm
Awarding of order(s)/contract(s)
GK Energy Limited · GKENERGY
✦ AI Summary▲ PositiveOrder Win
GK Energy Limited has received a Letter of Empanelment for a 100 MW Grid Connected Rooftop Solar Photovoltaic Project from a State Government-owned power distribution utility, with a total value of Rs. 454.50 Crore (inclusive of GST).
Analysis Scores
Earnings Impact8/10
Growth Catalyst6/10
Governance Concern1/10
Regulatory Risk1/10
Balance Sheet Risk1/10
Liquidity Impact9/10
Market Sentiment8/10
✦ Ask a Question
Ask anything about this announcement — AI will answer based on the filing content.
Full Announcement
GK Energy Limited has informed the exchange that the Company has received a Letter of Empanelment for 1,00,000 Grid Connected Rooftop Solar Photovoltaic Project aggregating to 100 MW. The total value of order is Rs. 454.50 Crore (inclusive of GST)
Attachments (1)
📄pdf
Download →
GKENERGY_26082026152313_Intimation_sd.pdf
View document text
Date: August 26, 2026
To, To,
Listing Department Listing Department
National Stock Exchange of India Limited BSE Limited
Exchange Plaza, C-1, Block G, Phiroze Jeejeebhoy Towers,
Bandra Kurla Complex Bandra (East), Mumbai Dalal Street,
– 400 051 Mumbai – 400 001
NSE Symbol: GKENERGY Scrip Code BSE- 544525
Dear Sir/Madam,
Subject: Announcement under Regulation 30 of SEBI (Listing Obligations and Disclosure
Requirements) Regulation, 2015 (“SEBI Listing Regulations”)
Pursuant to Regulation 30 of SEBI Listing Regulations read with Schedule III thereof, We are pleased
to inform you that GK Energy Limited (“the Company”) has received a Letter of Empanelment (“LOE”)
from a leading State Government-owned power distribution utility for execution of Grid Connected
Rooftop Solar Photovoltaic Projects.
Under the said empanelment, the Company has been allocated 1,00,000 Grid Connected Rooftop Solar
photovoltaic project of 1 kW each, aggregating to 100 MW to be installed at 1,00,000 households, at a
contract rate of ₹45,450 per kW including GST, representing an aggregate contract value of
approximately ₹454.50 crore including GST.
The scope of work includes design, engineering, supply, installation, testing and commissioning of
Grid Connected Rooftop Solar PV systems along with O& M for a period of five years.
The details as required under Regulation 30 read with Para B of Part A of Schedule III of the SEBI
Listing Regulations and SEBI Master Circular No. HO/49/14/14(7)2025-CFD-POD2/I/3762/2026
dated 30th January, 2026 are enclosed herewith as Annexure A.
The disclosure is being made available on the Company’s website at www.gkenergy.in
You are requested to kindly take the above information on your records.
Thanking you,
By order of Board of Directors
For GK ENERGY LIMITED
(Formerly known as GK Energy Private Limited,
GK Energy Marketers Private Limited)
Shubham Suresh Jain
Company Secretary & Compliance Officer
Membership No. A76578
Place: Pune
Annexure - A
Particulars Details
1. Name of the entity awarding the State Government-owned power distribution
order(s)/contract(s) utility company
2. Significant terms and conditions of order(s) Design, engineering, supply, installation,
/ contract(s) awarded in brief testing and commissioning of Grid Connected
Rooftop Solar PV systems along with O& M for
a period of five years.
3. Whether order(s) /contract(s) have been Domestic Entity
awarded by domestic/international entity
4. Nature of order(s) /contract(s) One time
5. Whether domestic or international Domestic
6. Time period by which the Within 60 days from the issuance of respective
order(s)/contract(s) is to executed work order
7. Broad consideration or size of the order(s) The total amount of work order is Rs. 454.50
/contract(s) Crores (Inclusive of GST).
8. Whether the promoter/ promoter group / No
group companies have any interest in the
entity that awarded the
order(s)/contract(s)? If yes, nature of
interest and details thereof
9. Whether the order(s)/contract(s) would fall No
within related party transactions?
If yes, whether the same is done at “arm’s
length”