BSECompany Update23h ago · 19 Aug 2026, 07:02 pm

Intimation of Investor presentation

Pace Digitek Ltd · 544550

✦ AI SummaryProduct Launch

Pace Digitek Ltd has announced an investor presentation, highlighting its integrated energy platform and telecom infrastructure capabilities, with a focus on battery energy storage systems (BESS) and renewable energy solutions.

Analysis Scores

Earnings Impact2/10
Growth Catalyst8/10
Governance Concern1/10
Regulatory Risk1/10
Balance Sheet Risk2/10
Liquidity Impact6/10
Market Sentiment5/10

✦ Ask a Question

Ask anything about this announcement — AI will answer based on the filing content.

0/500

Full Announcement

Pace Digitek Ltd - 544550 - Intimation Of Investor Presentation

Attachments (1)

📄

01aa61d4-16bc-4417-9d8c-990ce6e61c95.pdf

pdf

Download →
View document text
Pace Digitek Limited (Formerly Known as Pace Digitek Private Limited and Pace Digitek Infra Private Limited) Regd. Office: Plot No. V-12, Industrial Estate, Kumbalgodu, Mysore Highway, Bangalore - 560 074. T : +91 80 29547792 / 94 / 95 / 96. E : info@pacedigitek.com w : www.pacedigitek.com CIN-L31909KA2007PLC041949 Ref No: PDL/2026-27/Q02_32 Date: August 19, 2026 BSE Limited National Stock Exchange of India Ltd Phiroze Jeejeebhoy Towers Exchange Plaza, C-1, Block G Dalal Street, Fort Bandra Kurla Complex, Bandra (E) Mumbai – 400001 Mumbai – 400051 Scrip Code – 544550 Symbol – PACEDIGITK Dear Sir/Madam, Sub: Intimation of Investor’s Presentation pursuant to Regulation 30 of the SEBI (Listing Obligations and Disclosure Requirements) Regulations, 2015 Pursuant to Regulation 30 read with Schedule III of SEBI (Listing Obligations and Disclosure Requirements) Regulations, 2015, we enclose herewith a copy of the Investor’s Presentation. The same has also been uploaded on the Company’s website which may be viewed at https://www.pacedigitek.com You are requested to take the above information on records. Thanking You, For PACE DIGITEK LIMITED [Formerly known as Pace Digitek Private Limited and Pace Digitek Infra Private Limited] Meghana M P Company Secretary and Compliance Officer Membership No: A42534 Add: Plot No. V-12, Industrial Estate, Kumbalgodu, Mysore Highway, Bangalore - 560 074. Encl.: As Above. Pace Digitek Ltd. Corporate Presentation | August 2026 Telecom & ICT BESS Energy Long Term O&M Infrastructure Manufacturing Integration Services Pace Digitek : End-to-End Integrated Infrastructure Platform Presence across telecom and energy infrastructure through Manufacturing | EPC execution | O&M capabilities Telecom Energy Years industry experience Manufacturing facilities Electrical Telecom Tower Fiber Solar BESS Transmission & Distribution 8,000+ Green field telecom towers installed • Products Supply • Products Supply • EPC – Solar Plants, • EPC • EPC projects in Solar Water substations, Pumps transmission & 5 → 10 GWh • Project Execution • Project Execution • Developer distribution systems BESS manufacturing • Developer capacity expansion under way • Services • Services • Manufacturing of BESS & PCS Rs. 108,033 million Order book Industry Tailwinds India’s BESS Market Is Moving from Emerging to Large-Scale Deployment Rapid renewable capacity addition, grid-flexibility requirements and evolving procurement frameworks are creating a structural need for energy storage 236 GWh 30 GWh 500 GW 4% BESS requirement by FY2031-32 BESS capacity supported under VGF; Non-fossil capacity target by 2030 Energy Storage Obligation by FY2030; ₹5,400 Cr central VGF committed increases by 0.5% annually till FY2030 Requirement Trajectory Where Storage Sits In The Chain Policy Tailwinds Driving Adoption Energy Storage Obligation FY2026-27 Renewable Integration Rising progressively from 1% in FY2024 to 4% by FY2030 Intermittency → Need for flexible storage 34.72 GWh Grid Flexibility & Firm Power Viability Gap Funding FY2031-32 ₹18 lakh per MWh, disbursed against commissioning T&D system integration 236.22 GWh milestones Battery Energy Storage RTC / FDRE procurement Manufacturing, EPC, BOO and O&M Increasing integration of storage with renewable power 6.8x growth in required storage between FY2027 and FY2032 BESS Deployment PLI – Advanced Chemistry Cells Including pumped hydro, total storage requirement reaches 411.4 GWh by FY2032. Utility-scale + C&I + Critical Infrastructure Supports domestic manufacturing and localisation Combination of rising storage requirements, policy support and long-term procurement is creating a growing market for BESS manufacturing, EPC, BOO and O&M. Sources: National Electricity Plan (Generation) 2022-32, Central Electricity Authority, 2023 · Viability Gap Funding Scheme for BESS supported through Power System Development Fund, Ministry of Power, 2025 · Order on Renewable Purchase Obligation and Energy Storage Obligation Trajectory, Ministry of Power · Non-fossil capacity target, MNRE / PIB India’s Telecom Infrastructure Build-out Supports Sustained EPC & O&M Demand 5G expansion, tower fibreisation, rural broadband and network modernisation are driving continued investment across telecom infrastructure. 2.2x OFC network 8.43 lakh 5.18 lakh ₹1.39 L cr growth since 2019 Telecom towers installed 5G BTS deployed 19.35 lakh → 42.36 lakh route km BharatNet programme outlay Key Demand Drivers • 5G & Network Densification | Increasing BTS deployments and network modernisation are supporting tower and telecom power requirements. • Tower Fibreisation | Higher fibre connectivity is required to support rising data traffic and network quality. • BharatNet & Rural Broadband | Government-led broadband expansion is driving OFC deployment across rural and semi-urban markets. • Enterprise & Digital Infrastructure | Data centres, enterprise connectivity, smart infrastructure and railway modernisation are creating adjacent demand. Pace participates across telecom power, tower infrastructure, OFC, ICT and lifecycle O&M — benefiting from both network expansion and the growing installed infrastructure base. Sources: DoT Year End Review 2025 (PIB PRID 2206477) · 5G Status, DoT/PIB 2026 (PRID 2223772) · BharatNet, DoT/PIB 2023 (PRID 2077908) · DoT Year End Review 2024 (PRID 2088195) Energy Business Our Energy Segment Business Model Integrated Energy Platform Driving Lifecycle Value Creation Manufacturing → EPC → BOO (Annuity Model) BESS Manufacturing Platform • 5 → 10 GWh scale-up • Cost leadership, supply chain control and margin expansion EPC: Integrated Execution Platform • Faster deployment using in-house systems • Margin enhancement through product integration Asset Ownership: Leveraging Backward Integration to EPC & Products • Long-term contracted revenue • Lifecycle value capture (O&M + performance) BESS System Architecture & Integration Capability Integrated Platform: From Pack to Grid-Scale Systems System Engineering ✓ Pack-to-container integration ✓ ESS container design and manufacturing Containerized BESS Power Electronics Cell Pack Rack System ✓ PCS integration ✓ Grid synchronization Digital Platform ✓ EMS platform Power Conversion Energy Management Cloud Monitoring System System ✓ Cloud monitoring & analytics Integrated Energy Ecosystem Comprehensive value chain coverage from manufacturing to asset ownership Manufacturing → EPC → BOO Supply EPC BOO Manufacturing & Sales Engineering & Construction Build-Own-Operate In-house BESS manufacturing platform with Integrated execution platform with faster Asset ownership with long-term contracted cost leadership and supply chain control. deployment using in-house systems. cash flows and attractive IRR. • BESS DC Blocks • Turnkey EPC execution • Long-term contracts • Power Conversion Systems • Design & engineering • Revenue visibility • Energy Management Systems • Project management • O&M services 12-14% 7-10% 13-14% Margin Margin Equity IRR BESS Business Operational and Strategic Milestones (As of August 5, 2026) Building integrated manufacturing, execution and lifecycle capabilities across the BESS value chain Operationalized BESS manufacturing facilities with 5 GWh installed capacity and BESS Manufacturing Scale-up delivered over 300 grid-scale BESS containers Utility-Scale Order Secured diversified utility-scale BESS and renewable-linked projects with 5.10 GWh Wins executable order visibility across BOO, EPC and supply models Execution Milestone Executed 975 MWh of utility-scale BESS capacity till Q1 FY2027 Advanced in-house container fabrication and manufacturing automation to Backward Integration Progress strengthen localization and supply-chain control 5 C&I Energy Storage Developed C&I energy storage prototype solutions with commercialization planned Development from Q2 FY27 1100 Order Book (Energy) Diversified Order Book of Rs. 84,530 Mn Total Executable Client Project Type Scope GWh Value (Rs. Mn) [Showing first 8,000 characters — download PDF for full document]