NSEGeneral Updates20h ago · 19 Aug 2026, 07:05 pm
General Updates
Pace Digitek Limited · PACEDIGITK
✦ AI Summary
Pace Digitek Limited has informed the Exchange about General Updates - Investor presentation, which includes a copy of the Investor’s Presentation and its upload on the Company’s website.
Analysis Scores
Earnings Impact5/10
Growth Catalyst6/10
Governance Concern1/10
Regulatory Risk2/10
Balance Sheet Risk4/10
Liquidity Impact8/10
Market Sentiment5/10
✦ Ask a Question
Ask anything about this announcement — AI will answer based on the filing content.
Full Announcement
Pace Digitek Limited has informed the Exchange about General Updates - Investor presentation
Attachments (1)
📄pdf
Download →
PACE_19082026190500_Intimation-Investor_Presentation.pdf
View document text
Pace Digitek Limited
(Formerly Known as Pace Digitek Private Limited
and Pace Digitek Infra Private Limited)
Regd. Office: Plot No. V-12, Industrial Estate,
Kumbalgodu, Mysore Highway, Bangalore - 560 074.
T : +91 80 29547792 / 94 / 95 / 96.
E : info@pacedigitek.com
w : www.pacedigitek.com
CIN-L31909KA2007PLC041949
Ref No: PDL/2026-27/Q02_32
Date: August 19, 2026
BSE Limited National Stock Exchange of India Ltd
Phiroze Jeejeebhoy Towers Exchange Plaza, C-1, Block G
Dalal Street, Fort Bandra Kurla Complex, Bandra (E)
Mumbai – 400001 Mumbai – 400051
Scrip Code – 544550 Symbol – PACEDIGITK
Dear Sir/Madam,
Sub: Intimation of Investor’s Presentation pursuant to Regulation 30 of the SEBI (Listing Obligations
and Disclosure Requirements) Regulations, 2015
Pursuant to Regulation 30 read with Schedule III of SEBI (Listing Obligations and Disclosure
Requirements) Regulations, 2015, we enclose herewith a copy of the Investor’s Presentation.
The same has also been uploaded on the Company’s website which may be viewed at
https://www.pacedigitek.com
You are requested to take the above information on records.
Thanking You,
For PACE DIGITEK LIMITED
[Formerly known as Pace Digitek Private Limited
and Pace Digitek Infra Private Limited]
Meghana M P
Company Secretary and Compliance Officer
Membership No: A42534
Add: Plot No. V-12, Industrial Estate, Kumbalgodu,
Mysore Highway, Bangalore - 560 074.
Encl.: As Above.
Pace Digitek Ltd.
Corporate Presentation | August 2026
Telecom & ICT BESS Energy Long Term O&M
Infrastructure Manufacturing Integration Services
Pace Digitek : End-to-End Integrated Infrastructure Platform
Presence across telecom and energy infrastructure through
Manufacturing | EPC execution | O&M capabilities
Telecom Energy
Years industry experience
Manufacturing facilities
Electrical
Telecom Tower Fiber Solar BESS
Transmission &
Distribution 8,000+
Green field telecom towers installed
• Products Supply • Products Supply • EPC – Solar Plants, • EPC • EPC projects in
Solar Water substations,
Pumps transmission &
5 → 10 GWh
• Project Execution • Project Execution • Developer distribution
systems BESS manufacturing
• Developer capacity expansion under way
• Services • Services • Manufacturing of
BESS & PCS
Rs. 108,033 million
Order book
Industry Tailwinds
India’s BESS Market Is Moving from Emerging to Large-Scale Deployment
Rapid renewable capacity addition, grid-flexibility requirements and evolving procurement frameworks are creating a
structural need for energy storage
236 GWh 30 GWh 500 GW 4%
BESS requirement by FY2031-32 BESS capacity supported under VGF; Non-fossil capacity target by 2030 Energy Storage Obligation by FY2030;
₹5,400 Cr central VGF committed increases by 0.5% annually till FY2030
Requirement Trajectory Where Storage Sits In The Chain Policy Tailwinds Driving Adoption
Energy Storage Obligation
FY2026-27 Renewable Integration
Rising progressively from 1% in FY2024 to 4% by FY2030
Intermittency → Need for flexible storage
34.72 GWh
Grid Flexibility & Firm Power Viability Gap Funding
FY2031-32
₹18 lakh per MWh, disbursed against commissioning
T&D system integration
236.22 GWh milestones
Battery Energy Storage RTC / FDRE procurement
Manufacturing, EPC, BOO and O&M Increasing integration of storage with renewable power
6.8x growth in required storage between
FY2027 and FY2032
BESS Deployment PLI – Advanced Chemistry Cells
Including pumped hydro, total storage requirement reaches
411.4 GWh by FY2032. Utility-scale + C&I + Critical Infrastructure Supports domestic manufacturing and localisation
Combination of rising storage requirements, policy support and long-term procurement is creating a growing market for BESS manufacturing, EPC, BOO
and O&M.
Sources: National Electricity Plan (Generation) 2022-32, Central Electricity Authority, 2023 · Viability Gap Funding Scheme for BESS supported through Power System Development Fund, Ministry of Power, 2025 · Order on Renewable Purchase Obligation and Energy
Storage Obligation Trajectory, Ministry of Power · Non-fossil capacity target, MNRE / PIB
India’s Telecom Infrastructure Build-out Supports Sustained EPC & O&M Demand
5G expansion, tower fibreisation, rural broadband and network modernisation are driving continued investment across
telecom infrastructure.
2.2x
OFC network
8.43 lakh 5.18 lakh ₹1.39 L cr
growth since 2019
Telecom towers installed 5G BTS deployed 19.35 lakh → 42.36 lakh route km BharatNet programme outlay
Key Demand Drivers
• 5G & Network Densification | Increasing BTS deployments and network modernisation are supporting tower and telecom power
requirements.
• Tower Fibreisation | Higher fibre connectivity is required to support rising data traffic and network quality.
• BharatNet & Rural Broadband | Government-led broadband expansion is driving OFC deployment across rural and semi-urban
markets.
• Enterprise & Digital Infrastructure | Data centres, enterprise connectivity, smart infrastructure and railway modernisation are
creating adjacent demand.
Pace participates across telecom power, tower infrastructure, OFC, ICT and lifecycle O&M — benefiting from both network
expansion and the growing installed infrastructure base.
Sources: DoT Year End Review 2025 (PIB PRID 2206477) · 5G Status, DoT/PIB 2026 (PRID 2223772) · BharatNet, DoT/PIB 2023 (PRID 2077908) · DoT Year End Review 2024 (PRID 2088195)
Energy
Business
Our Energy Segment Business Model
Integrated Energy Platform Driving Lifecycle Value Creation
Manufacturing → EPC → BOO (Annuity Model)
BESS Manufacturing Platform
• 5 → 10 GWh scale-up
• Cost leadership, supply chain control and margin expansion
EPC: Integrated Execution Platform
• Faster deployment using in-house systems
• Margin enhancement through product integration
Asset Ownership: Leveraging Backward Integration to EPC & Products
• Long-term contracted revenue
• Lifecycle value capture (O&M + performance)
BESS System Architecture & Integration Capability
Integrated Platform: From Pack to Grid-Scale Systems
System Engineering
✓ Pack-to-container
integration
✓ ESS container design
and manufacturing
Containerized BESS Power Electronics
Cell Pack Rack
System
✓ PCS integration
✓ Grid synchronization
Digital Platform
✓ EMS platform
Power Conversion Energy Management
Cloud Monitoring
System System
✓ Cloud monitoring &
analytics
Integrated Energy Ecosystem
Comprehensive value chain coverage from manufacturing to asset ownership
Manufacturing → EPC → BOO
Supply EPC BOO
Manufacturing & Sales Engineering & Construction Build-Own-Operate
In-house BESS manufacturing platform with Integrated execution platform with faster Asset ownership with long-term contracted
cost leadership and supply chain control. deployment using in-house systems. cash flows and attractive IRR.
• BESS DC Blocks • Turnkey EPC execution • Long-term contracts
• Power Conversion Systems • Design & engineering • Revenue visibility
• Energy Management Systems • Project management • O&M services
12-14% 7-10% 13-14%
Margin Margin Equity IRR
BESS Business Operational and Strategic Milestones
(As of August 5, 2026)
Building integrated manufacturing, execution and lifecycle capabilities across the BESS value chain
Operationalized BESS manufacturing facilities with 5 GWh installed capacity and
BESS Manufacturing
Scale-up delivered over 300 grid-scale BESS containers
Utility-Scale Order Secured diversified utility-scale BESS and renewable-linked projects with 5.10 GWh
Wins executable order visibility across BOO, EPC and supply models
Execution Milestone Executed 975 MWh of utility-scale BESS capacity till Q1 FY2027
Advanced in-house container fabrication and manufacturing automation to
Backward Integration
Progress strengthen localization and supply-chain control
5 C&I Energy Storage Developed C&I energy storage prototype solutions with commercialization planned
Development from Q2 FY27
1100
Order Book (Energy)
Diversified Order Book of Rs. 84,530 Mn
Total Executable
Client Project Type Scope GWh
Value (Rs. Mn)
[Showing first 8,000 characters — download PDF for full document]