BSECompany Update6d ago · 14 Aug 2026, 03:03 pm

Unaudited results-newspaper publication

Kanchi Karpooram Ltd · 538896

✦ AI SummaryResults

Kanchi Karpooram Ltd has published unaudited financial results for the quarter ended 30th June 2026, in accordance with Regulations 30 and 47 of the Securities and Exchange Board of India (Listing Obligations and Disclosure Requirements) Regulations, 2015. The results were published in 'Trinity Mirror' and 'Makkal Kural' on 13th August 2026.

Analysis Scores

Earnings Impact5/10
Growth Catalyst2/10
Governance Concern1/10
Regulatory Risk1/10
Balance Sheet Risk2/10
Liquidity Impact8/10
Market Sentiment5/10

✦ Ask a Question

Ask anything about this announcement — AI will answer based on the filing content.

0/500

Full Announcement

Kanchi Karpooram Ltd - 538896 - Announcement under Regulation 30 (LODR)-Newspaper Publication

Attachments (1)

📄

33e313c0-5e17-45a9-a938-d52ed4acd1a9.pdf

pdf

Download →
View document text
CIN: L20118TN1992PLC022109 An ISO 9001: 2015 Certified Company Ref: KKL/SE-Q1-13/2026-27 14/08/2026 BSE Limited, Phiroze Jeejeebhoy Towers, Dalal Street, Mumbai – 400 001. Dear Sir/Madam, Sub: Newspaper Publication of Unaudited Financial Results for the quarter ended 30th June 2026. Ref: Scrip ID – KANCHI, Scrip Code – 538896 Pursuant to Regulations 30 and 47 of the Securities and Exchange Board of India (Listing Obligations and Disclosure Requirements) Regulations, 2015, please find enclosed copies of unaudited financial results for the quarter ended 30th June 2026, published in ‘Trinity Mirror’ and ‘Makkal Kural’ on 13th August 2026. Kindly take the above information on records. Thank you. FOR KANCHI KARPOORAM LIMITED K ABIRAMI Company Secretary CHENNAI - 13-AUGUST-2026 Chennai sets Sept 30 deadline for monsoon works Chennai, Aug 13: The Greater Chennai Corporation has set September 30 as the deadline to complete monsoon- preparedness works across the city, including desilting Librarians’ Day celebrated at 1,300 km of stormwater drains and cleaning 1.10 lakh silt catch pits, as it steps up Annamalai University preparations for the northeast monsoon and possible intense rainfall linked to El Nino. Chidambaram, Aug 13: libraries in the digital address. He spoke about the dignitaries, organisers, Joint Commissioner Librarians’ Day 2026 era and appreciated the the contributions of Dr. faculty members, research (Works) C. Saravanan on was celebrated at the C. P. contribution of librarians S. R. Ranganathan and scholars, students and Wednesday inspected the Ramaswami Aiyar Library, in supporting teaching, explained how libraries library staff for their first mock drill to check Annamalai University, on learning and research. have evolved from participation. the operational readiness of August 12 to mark the Prof. V. Ambedkar, traditional repositories The celebration vehicles, heavy machinery, birth anniversary of Dr. S. Dean, Faculty of of books into dynamic paid tribute to Dr. S. pumps and rescue equipment R. Ranganathan, regarded Education, spoke about centres of knowledge and R. Ranganathan and at Ripon Buildings. Similar checks positioned to drain water from road-cutting works. as the Father of Library the libraries he had visited information. highlighted the continuing were carried out at all zonal and severely low-lying areas. Additional Special attention is being given Science in India. and encouraged students As part of the importance of libraries and ward offices. 80 HP to 100 HP pumps and to areas that have experienced The Corporation has around tractor-operated pumps will also be flooding during previous monsoons. Prof. K. Vijayakumar, to make regular use of celebrations, English librarians in education, 3,000 km of stormwater drains, of hired depending on requirements. Officials said 383 waterlogging- Librarian, welcomed the libraries and develop elocution, painting, research and society. which desilting is under way along To ensure that equipment prone locations were identified gathering and highlighted the habit of reading. slogan-writing and book- nearly 1,300 km. The work is being remains operational, Rs 5 lakh during Cyclone Michaung in 2023. the role of libraries and He said reading would talk competitions were monitored using drones and GPS. has been allotted to each ward Permanent stormwater drain works librarians in promoting help students become conducted on August 10. Silt is also being removed from to carry out minor repairs and have been completed at some knowledge, research and confident and self-reliant Prizes and certificates were 1,10,082 catch pits to ensure the other immediate pre-monsoon locations, while pumps are being lifelong learning. The and prepare them to face presented to the winners. free flow of rainwater. requirements. Separately, around Rs planned as an interim measure at dignitaries and participants the challenges of the Dr. S. Kalpana and Dr. The civic body currently has 1 crore has been allocated to each others. Joint field inspections are paid floral tributes to Dr. modern world. K. Praveena organised the around 700 pumps and machines zone for repairing temporary road also being carried out at flood- S. R. Ranganathan. Prof. P. Sivaraman, competitions. and has contracted another 150 depressions and potholes. prone areas such as Velachery, Prof. Arul, Dean, Professor and Head, The programme machines on a rental basis for the Desilting is also under way in the Pallikaranai and Okkiyam Maduvu Faculty of Arts, Department of Library concluded with a vote monsoon, including tractor-mounted city's waterways. The Corporation's by the Corporation, Water Resources delivered the presidential and Information Science, of thanks by Dr. S. 100 HP pumps. Pumps ranging 44 waterways and major channels address. He spoke about Annamalai University, Balakrishnan, Assistant Department, Chennai Metro Rail from 5 HP to 150 HP will be and rivers maintained by the Water the changing role of delivered the special Librarian, who thanked and Highways Department. deployed depending on flooding Resources Department, including the Saravanan said the preparations conditions. Cooum, Adyar, Buckingham Canal, were being drawn up based on the The equipment being kept ready Otteri Nullah, Virugambakkam city's experience during the 2015, includes two amphibian machines, Canal and Veerangal Odai, are being GITA RENEWABLE ENERGY LIMITED CHENNAI FERROUS INDUSTRIES LIMITED three mini-amphibians, six robotic taken up as part of the preparations. 2023 and 2025 monsoons. The Registered Office: Survey No.180 & 181 Registered Office: SurveyNo.180-183,190&191, multipurpose excavators, three Officials have been instructed to civic body was also preparing for OPG Nagar Periya Ob Gu ula mp mur ia dm ip oV oil nla dg i,e T, hN ia ruga vara llj ua r ,K Ta Nnd - i 6g 0a 1i, 2 M 01adharapakkam Road, Periya Obulapu Gra um m mVi il dla ipg oe o, N nda ig ,a Tr ha ij ra u K va an llud rig , a Ti N, -M 6a 0d 1h 2a 0r 1apakkam Road, amphibious excavators, seven ensure that works being carried extreme rainfall events, including CIN:L40108TN2010PLC074394 I investor@gitarenewable.com CIN:L273101N2010PLC075626 I investor@chennaiferrous.com recycler vehicles, 15 hydraulic out by the Corporation, Chennai the possibility of cloudburst-like www.gitarenewable.com I Ph: 044-27991450 www.chennaiferrous.com I Ph: 044-27991450 tree-cutting machines, 10 truck- Metrowater, electricity department conditions, he said. UNAUDITED FINANCIAL RESULTS FOR THE UNAUDITED FINANCIAL RESULTS FOR THE mounted cranes, five hydraulic and other agencies are expedited The government is expected to QUARTER ENDED 30th JUNE, 2026 QUARTER ENDED 30th JUNE, 2026 ladders, six front-end loaders, seven and completed by September 30. issue guidelines for the public on Pursuant to [Regulation 47 (1) (b) of the SEBI (LODR) Regulations, 2015] Pursuant to [Regulation 47 (1) (b) of the SEBI (LODR) Regulations, 2015] hydraulic excavators and 60 skid- Inter-departmental coordination precautions to be followed during Based on the recommendations of the Audit Committee, the Based on the recommendations of the Audit Committee, the steer loaders. meetings are being held every extreme rainfall events, officials Board of Directors of the Company, at its meeting held on Board of Directors of the Company, at its meeting held on Wednesday, 12th August, 2026 has approved the Unaudited Wednesday, 12th August, 2026 has approved the Unaudited High-capacity pumps will be Tuesday to address issues including said. Financial Results for the quarter ended 30th June, 2026. Financial Results for the quarter ended 30th June, 2026. The full Financial Results along with Limited Review Report of The full Financial Results along with Limited Review Report of the said Unaudited Standalone Financial Results for the Quarter the said Unaudited Standalone Financial Results for the Quarter ended 30th June, 2026 at available on the website of BS [Showing first 8,000 characters — download PDF for full document]