NSEBagging/Receiving of orders/contracts2d ago · 20 Jul 2026, 06:44 am

Bagging/Receiving of orders/contracts

VA Tech Wabag Limited · WABAG

✦ AI Summary▲ PositiveOrder Win

VA Tech Wabag Limited has secured a large order from Bangalore Water Supply and Sewerage Board (BWSSB) for two energy-efficient wastewater treatment facilities.

Analysis Scores

Earnings Impact8/10
Growth Catalyst9/10
Governance Concern1/10
Regulatory Risk1/10
Balance Sheet Risk1/10
Liquidity Impact9/10
Market Sentiment9/10

✦ Ask a Question

Ask anything about this announcement — AI will answer based on the filing content.

0/500

Full Announcement

WABAG Secures Large Order Inflow from BWSSB for Two Energy-Efficient Wastewater Treatment Facilities

Attachments (1)

📄

VATECH_20072026063902_SIBWSSB20July26.pdf

pdf

Download →
View document text
An ISO 9001 Company July 20, 2026 National Stock Exchange of India Limited BSE Limited, Exchange Plaza, Plot No. C/1, G Block, Floor 25, P J Towers, Bandra Kurla Complex, Dalal Street, Bandra (E), Mumbai – 400 051 Mumbai – 400 001 NSE Symbol: WABAG BSE Scrip Code: 533269 Dear Sir/Madam, Sub.: “Bagging of Order/Contract” - WABAG Secures ‘Large’ Order Inflow from BWSSB for Two Energy-Efficient Wastewater Treatment Facilities Ref.: Intimation under Regulation 30 of the SEBI (Listing Obligations & Disclosure Requirements) Regulations, 2015 Please find enclosed the intimation for WABAG securing ‘Large’ Order Inflow from Bangalore Water Supply and Sewerage Board (BWSSB) for Two Energy-Efficient Wastewater Treatment Facilities. The details as required under Reg. 30 of the SEBI (Listing Obligations & Disclosure Requirements) Regulations, 2015 read with the SEBI circular no. SEBI/HO/CFD/PoD2/CIR/P/0155 dated November 11, 2024, as amended is enclosed as Annexure-I. This is for your information and records. Thanking You, Yours faithfully, For VA TECH WABAG LIMITED Anup Kumar Samal Company Secretary & Compliance Officer Membership No. FCS 4832 Encl.: As above Sustainable solutions, for a better life VA TECH WABAG LIMITED Board : +91- 44 - 6123 2323 CIN: L45205TN1995PLC030231 Fax : : +91- 44 - 6123 2324 “WABAG HOUSE”, Email : wabag@wabag.in No.17, 200 Feet Thoraipakkam-Pallavaram Main Road, Web : www.wabag.com Sunnambu Kolathur, Chennai 600 117, India. STOCK EXCHANGE INTIMATION VA TECH WABAG LIMITED | WABAG House, No.17, 200 Feet Thoraipakkam – Pallavaram Main Road Sunnambu Kolathur, Chennai 600 117, India. CIN: L45205TN1995PLC030231 | Tel: +91 44 6123 2323 | www.wabag.com WABAG Secures ‘Large’ Order Inflow from BWSSB for Two Energy-Efficient Wastewater Treatment Facilities Chennai, July 20, 2026: VA TECH WABAG (‘WABAG’), a leading Pure-Play Multinational Water Technology Group, secured from the Bangalore Water Supply and Sewerage Board (‘BWSSB’), awards towards Design, Build, Operate (‘DBO’) of a 100 MLD and 60 MLD Sewage Treatment Plant (‘STP’) at Byramangala and Bellandur respectively, along with a 25 MLD Tertiary Treatment Plant (‘TTP’) at Byramangala. The scope includes the Design, Engineering, Procurement, Construction and Commissioning (‘EPC’) of the wastewater treatment facilities along with biogas-based power generation. The STPs will be based on the Activated Sludge Process integrated with a Biological Nutrient Removal system. The TTP at Byramangala will utilize Ultrafiltration to produce high-quality treated water suitable for distribution to surrounding water bodies. It is worth noting that, WABAG had previously executed the first phase of the Bellandur facility and has now been awarded the second phase as well. The EPC scope of the facilities is scheduled for completion within 36 months, followed by a 7-year Operations and Maintenance (‘O&M’) period, during which WABAG will ensure efficient and reliable plant performance. The Wastewater Treatment facilities at Byramangala and Bellandur will significantly strengthen Bengaluru's wastewater treatment and water infrastructure, addressing the city's growing challenges arising from rapid urbanization. The facility will incorporate anaerobic sludge digestion with biogas- based captive power generation, reducing greenhouse gas (‘GHG’) emissions, lowering the plant's energy footprint, enhancing operational efficiency, and promoting resource recovery. By integrating the treatment technologies with renewable energy generation, the project will support Bengaluru's long- term water security while advancing its sustainability and circular economy objectives. Commenting on the order wins, Mr. S. Natrajan, Vice President & Head – Sales and Marketing, India Cluster, said: “Securing these twin wins from BWSSB reinforces WABAG's leadership in India's municipal wastewater treatment sector and underscores its commitment to delivering sustainable, resilient, and future-ready water infrastructure. The energy-efficient wastewater treatment facilities, integrated with biogas-based power generation, will establish a scalable model for resource recovery, circularity, and energy optimization while significantly enhancing Bengaluru's sewage treatment capacity, promoting environmentally responsible wastewater management, supporting Karnataka's water security objectives, and strengthening the long-term sustainability and resilience of the city's water ecosystem.” Order Classification Small Medium Large Major Mega Domestic (in INR Crores) Upto 100 100 to 250 250 to 600 600 to 1,000 Above 1,000 International (In USD Millions) Upto 10 10 to 30 30 to 75 75 to 150 Above 150 STOCK EXCHANGE INTIMATION VA TECH WABAG LIMITED | WABAG House, No.17, 200 Feet Thoraipakkam – Pallavaram Main Road Sunnambu Kolathur, Chennai 600 117, India. CIN: L45205TN1995PLC030231 | Tel: +91 44 6123 2323 | www.wabag.com For further information, please contact: Nilamani Satapathy, Corporate Communications Email: Nilamani_Satapathy@wabag.in | Tel: +91 44 6123 2949 About WABAG: With over a century of expertise, WABAG stands as a global leader in water technology, delivering innovative and sustainable solutions for both municipal and industrial needs. As a pure-play Indian Water Technology Multinational, WABAG provides end-to-end water solutions tailored to diverse requirements across the world. Powered by more than 2,000 water professionals operating in 25+ countries, WABAG positively impacts millions of lives every day. Over the past three decades, the company has designed and built 1,500+ water and wastewater treatment plants globally, earning its reputation as a trusted lifecycle partner. WABAG manages every phase of the water value chain — from design, engineering, supply, and construction to installation, commissioning, and long-term operations across multiple business models. Driven by a strong culture of innovation, WABAG operates cutting-edge R&D centres in Europe and India and holds 125+ intellectual property rights. Its vision aligns with the United Nations Sustainable Development Goals and core ESG principles, with an emphasis on conservation, resource optimisation, recycling, and reuse. As one of the world’s foremost partners in water sustainability, WABAG continues to transform global water challenges into opportunities for a more resilient and sustainable future. STOCK EXCHANGE INTIMATION VA TECH WABAG LIMITED | WABAG House, No.17, 200 Feet Thoraipakkam – Pallavaram Main Road Sunnambu Kolathur, Chennai 600 117, India. CIN: L45205TN1995PLC030231 | Tel: +91 44 6123 2323 | www.wabag.com Annexure-I a) Name of the entity awarding the Bangalore Water Supply and Sewerage Board order(s)/ contract(s) (BWSSB) b) Significant terms and conditions of a. Design, Build and Operate (DBO) of 100 MLD order(s)/ contract(s) awarded in brief Sewage Treatment Plant (STP) and 25 MLD Tertiary Treatment Plant (TTP) at Byramangala, Bengaluru b. Design, Build and Operate (DBO) of 60 MLD Sewage Treatment Plant (STP) at Bellandur, Bengaluru c) Whether order(s) / contract(s) have Domestic Entity been awarded by domestic/ international entity d) Nature of order(s) / contract(s) Complete technology package for process engineering, electrical engineering, instrumentation and control, building services and Operations & Maintenance e) Whether domestic or international Domestic Project f) Time period by which the order(s)/ EPC Scope to be completed within 36 months contract(s) is to be executed followed by O&M for 7 years g) Broad consideration or size of the Large* order(s)/ contract(s) h) Whether the promoter/ promoter group / No group companies have any interest in the entity that awarded the order(s)/ contract(s)? If yes, nature of interest and details thereof i) Whether the order(s)/ contract(s) would No fall within related party transactions? If yes, whether the same is done at arm’s length *Note: ‘Large’ shall mean order inflow value of INR 250 to 600 Crores.