NSEInvestor Presentation7 Aug 2026 · 7 Aug 2026, 05:09 pm
Investor Presentation
Hitachi Energy India Limited · POWERINDIA
✦ AI SummaryESG
Hitachi Energy India Limited has made an investor presentation to analysts and investors, highlighting its safety performance, ESG targets, and actions taken to achieve them.
Analysis Scores
Earnings Impact0/10
Growth Catalyst0/10
Governance Concern0/10
Regulatory Risk0/10
Balance Sheet Risk0/10
Liquidity Impact0/10
Market Sentiment0/10
✦ Ask a Question
Ask anything about this announcement — AI will answer based on the filing content.
Full Announcement
Hitachi Energy India Limited has informed the Exchange about Investor Presentation
Attachments (1)
📄pdf
Download →
HitachiEnergy_07082026170845_Investorpptupload.pdf
View document text
HITACHI
August 07, 2026
The Secretary, The Manager,
Listing Department, Listing Department,
BSE Limited, National Stock Exchange of India Limited,
1st Floor, Phiroze Jeejeebhoy Towers, ‘Exchange Plaza’, 5th Floor, Plot No. C/1, G Block,
Dalal Street, Bandra Kurla Complex, Bandra (East),
Mumbai - 400 001 Mumbai - 400 051
Scrip Code: 543187 Scrip Symbol: POWERINDIA
Subject: Analysts/Investors’ Presentation
Dear Sir / Madam,
Pursuant to Regulation 30 of the SEBI (Listing Obligations and Disclosure Requirements) Regulations, 2015,
we are enclosing herewith a copy of Presentation to be made during the conference call with
Analysts/Investors as scheduled today i.e., August 07, 2026, for the information of the Stock Exchanges.
The above information is also hosted on the website of the Company at:
https://www.hitachienergy.com/in/en/investor-relations/analyst-section.
Kindly take the same on your records.
Thank you,
Yours faithfully,
For Hitachi Energy India Limited
Poovanna Ammatanda
General Counsel and Company Secretary
Encl.: as above
Hitachi Energy India Limited
Registered and Corporate Office:
8th Floor, Brigade Opus, 70/401,
Kodigehalli Main Road, Bengaluru - 560 092
Email ID: investors@hitachienergy.com
Phone: 080 68473700
CIN: L31904KA2019PLC121597
hitachienergy.com/in
Hitachi Energy India Ltd
Q1 FY26-27 | Analyst
Conference Call
N Venu, Managing Director and CEO
Symbol: POWERINDIA | Scrip code: 543187
7th August 2026
PPuubblliicc ©© 22002266 HHiittaacchhii EEnneerrggyy.. AAllll rriigghhttss rreesseerrvveedd..
Cautionary statement
This presentation has been prepared by Hitachi Energy India Limited (“Company”) solely for information purposes. While reasonable care has
been taken in preparing this presentation, no representation or warranty, express or implied, is made regarding the accuracy, completeness or
correctness of the information contained herein, except as required under applicable law. The information contained in this presentation should
not be construed as investment, legal, tax or other professional advice, and no reliance should be placed on it as the basis for any investment
decision.
This presentation may contain forward-looking statements based on current expectations, estimates, assumptions and projections, including
those relating to the business outlook, plans, strategy and future performance of the Company. Forward-looking statements may be identified
by terms such as “anticipate”, “expect”, “believe”, “estimate”, “target”, “forecast”, “intend”, “plan”, “may”, “will”, “could” or similar expressions.
These statements are not guarantees of future performance and are subject to risks, uncertainties and assumptions, including economic
conditions, regulatory changes, market developments, currency fluctuations, compliance-related costs and other factors disclosed in the
Company’s filings/disclosures with BSE Limited, National Stock Exchange of India Limited and/or SEBI, as applicable. Actual results may differ
materially from those expressed or implied.
Certain market, industry and economic information, if any, may be based on publicly available sources and/or third-party reports which have not
been independently verified by the Company. The information in this presentation is provided as of the date of this presentation and the
Company assumes no obligation to update or revise any information or forward-looking statement, except as required under applicable law.
This presentation does not constitute an offer, invitation, solicitation or recommendation to purchase, subscribe for or sell any securities of the
Company, nor shall it form the basis of any contract or commitment. This presentation is not a prospectus, offer document, placement document
or other issue document under applicable securities laws. Investment in securities involves risks, including possible loss of principal. Viewers
should consult their own independent professional advisers before making any investment decision
2 PPuubblliicc ©© 22002266 HHiittaacchhii EEnneerrggyy.. AAllll rriigghhttss rreesseerrvveedd..
License to operate
Safety
Performance Operations
0.16
Total recordable injury frequency rate
(TRIFR)
Target: 0.09
450+
Lifesaving rules inspections performed
Health screening: Peenya Mock drill: Mysore Yoga Day: Doddaballapur
100%
High risk hazards closed on time
63 20 1300+
Safety Observation Tours (SOTs) Health Talks and First Aid & Basic Life Employees participated
performed
screening programs support trainings in International Yoga
Day awareness sessions
Zero at factories and o(cid:264)ces
Non-Conformance Reports (NCRs)
open and overdue
3 PPuubblliicc ©© 22002266 HHiittaacchhii EEnneerrggyy.. AAllll rriigghhttss rreesseerrvveedd..
ESG targets and action plan
Focus Segments Targets for 2030 from 2019 levels Actions and achievements against targets
78% reduction achieved to date. Actions include
installation of biofuel boiler in Mysore, electrical
Emission 50% reduction in CO emissions
2 retrofits, PPA for renewable electricity
100% renewable electricity across 100% renewable electricity achieved through rooftop
Renewable Electricity
operations solar, PPA and I-RECs
Planet
16% reduction in freshwater use achieved through
Water 25% reduction in freshwater use water recycling, water efficient fixtures and retrofits
initiatives
50% reduction in waste disposed to More than 80% reduction achieved, with 2 sites
Waste
landfill or incineration attaining zero waste to landfill
Zero fatalities achieved. Actions include HSE
Zero harm – zero fatalities and serious masterclass training, HSE Leadership development
Safety
injuries program training and regular HSE internal audits and
People self-assessments
Increase female representation from
Diversity Female representation has increased to 10%
5.8% to 16-18%
Principle Corruption Zero incidents of corruption and bribery No incidents of corruption and bribery reported
4 PPuubblliicc ©© 22002266 HHiittaacchhii EEnneerrggyy.. AAllll rriigghhttss rreesseerrvveedd..
India's energy transition driving grid investments
Policy support, electrification and digital infrastructure are driving unprecedented power demand growth
Demand Creation Infrastructure Response
500 GW renewables by 2030 driving massive grid integration demand. Green Hydrogen Mission alone to
Renewables
require ~125 GW of renewable capacity by 2030
Transmission Transmission roadmap of Rs 7.9 lakh Cr investment to integrate over 900 GW non fossil by FY35 (CEA)
Industry Proposed ₹1.25 lakh Cr allocation under ISM 2.0 signals stronger semiconductor push
Data center India DC capacity to reach 5-8 GW by 2030 with Mumbai & Chennai being hub
Indian Railways Rs 14,400 crore program with Kinet Railway Solutions aims to manufacture 120 Vande
Transport
Bharat Sleeper trainsets.
Distribution 6 Peak demand to reach 495 GW by 2035
1.. Renewable 2. Transmission 3.Semiconductor 4. Data center 5.. Indian Railways6. Peak Demand
5 PPuubblliicc ©© 22002266 HHiittaacchhii EEnneerrggyy.. AAllll rriigghhttss rreesseerrvveedd..
Solid performance driving growth and building margins
Rs Crs
Growth Growth
Particulars Q1FY27
YoY(%) QoQ (%)
Orders in Q1FY27
Orders 5,096.5 -55.1% 110.4%
Orders
26.1% 39.7%
(without HVDC) – Renewables: marked a milestone by securing the company's first
BESS project in Andhra Pradesh
Revenue 2,493.7 68.6% -9.5%
– Export: flagship order of 2GW for wind power evacuation in
Europe
PBT 389.5 120.2% -12.1%
– Industries: won prestigious order for a 100 GW solar park in
western India
PAT 294.2 123.5% -11.0%
– Data Centers: secured over 560 MVA power transformers, 800
MVA dry transformers and 230/33KV GIS over multiple data
Op. EBITDA 399.9 135.0% -11.6%
center orders during Q1FY27. Among these, the most significant
was a 40x2500 KVA project in Hyderabad, awarded by a leading
Op. EBITDA (%) 16.0% Indian multinational conglomerate
OBL ( As on) 32,222.1 10.6% 9.0%
6 PPuubblliicc ©© 22002266 HHiittaacchhii EEnneerrggyy.. AAllll rriigghhttss rreesseerrvveedd..
Key order
[Showing first 8,000 characters — download PDF for full document]