View document text
November 18, 2026
The BSE Limited The National Stock Exchange
Corporate Relations Department, of India Limited
P.J. Towers, Department of Corporate Services,
Dalal Street, Exchange Plaza, 5th Floor,
Mumbai-400 001. Bandra-Kurla Complex,
Scrip Code: 533263 Mumbai-400 051.
Scrip Code: GREENPOWER
Respected Sir/Madam,
Subject: Transcript of Investors/Analysts Call held on November 12, 2026.
In continuation to our letters dated November 05, 2026 and November 13, 2026 in respect of
Investors/Analysts Call, held on Thursday, the November 12, 2026, please find enclosed the
Transcript of discussion held during the said Investors/Analysts Call.
The aforesaid information is also available on the website of the Company on the below
mentioned link:
https://www.orientgreenpower.com/Investor-Presentations.asp
We request you to take the same on your records.
Thanking you,
Yours faithfully,
For Orient Green Power Company Limited
G. Srinivasa Ramanujan
Company Secretary & Compliance Officer
Orient Green Power Company Limited
Q2 & H1 FY '27 Earnings Conference Call
November 12, 2026
Moderator: Good afternoon, ladies and gentlemen, and welcome to the Earnings Conference Call of Q2 &
H1 FY '27 for Orient Green Power Company Limited.
As a reminder, all participant lines will be in the listen-only mode, and there will be an
opportunity for you to ask questions after the presentation concludes. Should you need
assistance during this conference call, please signal an operator by pressing “*” then “0” on
your touch-tone phone. Please note that this conference is being recorded.
Let us now begin with the introduction of the Management Team. We have with us today, Mr.
T. Shivaraman – Managing Director and CEO of the Company. Also joining us today is Ms. J.
Kotteswari – Chief Financial Officer.
I would now like to request Mr. T. Shivaraman – Managing Director and CEO, to give his opening
remarks and share the company's performance in Q2 & H1 FY '27 with the audience. Thank you
and over to you, sir.
T. Shivaraman: Thank you, and good afternoon to everyone. I hope all of you had a happy and peaceful Diwali.
I am pleased to welcome all of you to the Orient Green Power Earnings Call for Q2 and H1 of
FY '27.
I am glad to share that OGPL has recorded an H1 profit of over INR 100 crores this year, and in
this year it was without the INR 16 crores of one-time income that we had last year. So, the
operational performance has been better, and capacity addition and the improved credit rating
of the company has been able to allow us to maintain our profits even without the
extraordinary incomes.
Coming to performance updates:
The wind conditions in Q2 was better compared to Q1 of this year, despite a substantial delay
in the onset of the southwest monsoon. Compared to last year, it was an early onset monsoon.
This year was very much delayed. The progress of the monsoon was mostly satisfactory, so the
generation could recover.
However, the overall monsoon, the wind availability during this half year was lower than that
of the previous year. But in spite of that, due to our capacity addition and better availability of
Page 1 of 21
machines, we have been able to maintain and increase our generation during this quarter and
this half year, leading to an overall surplus of generation and income for the first half.
Consequently, for Q2 of FY '27, the total income was up by 8% to about INR 146.57 crores, and
EBITDA improved by 12% to INR 116.55 crores over the corresponding quarter in the previous
fiscal. For H1, total income and EBITDA were marginally better by about 2% at INR 232.81 crores
and 4% at INR 176.56 crores respectively over the corresponding period in the previous fiscal.
PAT for the quarter was steady at about INR 81.57 crores as against INR 80.94 crores in the
previous period. However, for the first half, it was slightly lower at INR 105.51 crores as against
INR 109.56 crores in the corresponding period last fiscal. This was primarily due to the
corresponding figure in the last fiscal which included a one-time exceptional gain of INR 16
crores representing refund of excess interest paid in earlier years, whereas the current period
profits comprise operational profits alone. There is no extraordinary income. Excluding the
exceptional gain, PAT for the first half of the current year would have been higher than by
about INR 12 crores on a like-to-like basis.
With regard to the capacity expansion, I am happy to share that we have successfully
commissioned a 17.6 megawatt solar plant during September 26th. The generation from this
plant will start accruing to the company from Q3 onwards. This CAPEX was funded from the
rights issue proceeds raised in August '24. Alongside the 7-megawatt plant, which is already
commissioned in December '25, the total solar capacity is at 24.6 megawatts, and the objects
of the rights issue have been completed.
We have started the project for repowering of 7.8 megawatts of old wind turbines. The project
is almost complete, and we are awaiting commissioning pending certain statutory approvals.
In addition, we have entered into an EPC contract for an additional 6.6 megawatts of new wind
capacity. This is partly funded with debt which has been tied up.
All these assets will be fully operational for the whole of the next financial year. Solar will be
generating significant revenue in Q3 and Q4 of this year. Wind, although will be commissioned
during Q3, the real impact on generation will be in the next fiscal.
On the balance sheet front, financial liquidity positions continue to remain healthy. We have
been able to get financing on competitive terms for the expansion plans, and we have been
executing the projects quite smoothly. And the credit rating of our main subsidiary has been
upgraded by 1 notch to BBB, and our solar subsidiary has also received a BBB rating.
So, we continue to look at CAPEX opportunities including repowering and the new projects as
well as certain acquisitions. A second repowering project is in advanced stage of planning and
we hope to start work on that shortly. And we are also looking at other potential opportunities
for expansion. As and when things develop, we will be keeping the shareholders informed.
Page 2 of 21
Thank you again for taking time to join us, and I hope, look forward to share more updates over
the course of the year as they arise. Happy to take questions now. Thank you.
Moderator: Thank you very much. We will now begin the question-and-answer session. First question is
from line of Faisal Hawa from H. G. Hawa and Company. Please go ahead.
Faisal Hawa: Sir, my first question is regarding the PLF. What is our PLF in this quarter, and how many more
wind power turbines do we now need to upgrade in order to have better PLF?
T. Shivaraman: So, we have currently the PLF overall. So, we have multiple subsidiaries. So, if you take the
major subsidiary, which is Beta, our PLF for the half year was about 26.82%, and for the quarter
was 33.11%. The other subsidiaries are relatively smaller when it comes to capacity, but this is
the major should we say, subsidiary. And of course solar was about 25%. In the older other
subsidiaries, PLFs for the quarter were between 28% and 30%, sorry, between 32% and 36%,
but then that includes also the newer capacity turbines.
In terms of what we need to repower, we have identified something like 30 to 40 megawatts
of capacity which will dramatically benefit from repowering. The issue is that some of them are
suitable for a hybrid mode of repowering rather than for a straightforward repowering with
wind because of the microsetting and certain technical issues with bringing in larger turbines.
So, that is something that we are working on.
The second, of course, minor issue is that the formal approval of the repowering policy in Tamil
Nadu has still not happened. The projects that we are doing, we are doing under a kind of
interim approval pending the passing of the final approval through the re
[Showing first 8,000 characters — download PDF for full document]