BSECompany Update12 Nov 2026 · 12 Nov 2026, 04:36 pm

Please refer the enclosed file

Hitachi Energy India Ltd · 543187

✦ AI SummaryResults

Hitachi Energy India Ltd has released an investor presentation for Q2 FY26-27, highlighting its safety, integrity, and quality performance, as well as its ESG progress and growth drivers in the Indian energy sector.

Analysis Scores

Earnings Impact5/10
Growth Catalyst8/10
Governance Concern2/10
Regulatory Risk3/10
Balance Sheet Risk4/10
Liquidity Impact9/10
Market Sentiment6/10

✦ Ask a Question

Ask anything about this announcement — AI will answer based on the filing content.

0/500

Full Announcement

Hitachi Energy India Ltd - 543187 - Announcement under Regulation 30 (LODR)-Investor Presentation

Attachments (1)

📄

fbc7d8df-a71d-43f1-ae49-540ed0e13a03.pdf

pdf

Download →
View document text
HITACHI November 12, 2026 The Secretary, The Manager, Listing Department, Listing Department, BSE Limited, National Stock Exchange of India Limited, 1st Floor, Phiroze Jeejeebhoy Towers, ‘Exchange Plaza’, 5th Floor, Plot No. C/1, G Block, Dalal Street, Bandra Kurla Complex, Bandra (East), Mumbai - 400 001 Mumbai - 400 051 Scrip Code: 543187 Scrip Symbol: POWERINDIA Subject: Analysts/Investors’ Presentation Dear Sir / Madam, Pursuant to Regulation 30 of the SEBI (Listing Obligations and Disclosure Requirements) Regulations, 2015, we are enclosing herewith a copy of Presentation to be made during the conference call with Analysts/Investors as scheduled today i.e., November 12, 2026, for the information of the Stock Exchanges. The above information is also hosted on the website of the Company at: https://www.hitachienergy.com/in/en/investor-relations/analyst-section. Kindly take the same on your records. Thank you, Yours faithfully, For Hitachi Energy India Limited Poovanna Ammatanda General Counsel and Company Secretary Encl.: as above Hitachi Energy India Limited Registered and Corporate Office: 8th Floor, Brigade Opus, 70/401, Kodigehalli Main Road, Bengaluru - 560 092 Email ID: investors@hitachienergy.com Phone: 080 68473700 CIN: L31904KA2019PLC121597 hitachienergy.com/in Hitachi Energy India Ltd Q2 FY26-27 | Analyst Conference Call N Venu, Managing Director and CEO Symbol: POWERINDIA | Scrip code: 543187 12th November 2026 PPuubblliicc ©© 22002266 HHiittaacchhii EEnneerrggyy.. AAllll rriigghhttss rreesseerrvveedd.. Cautionary statement This presentation has been prepared by Hitachi Energy India Limited (“Company”) solely for information purposes. While reasonable care has been taken in preparing this presentation, no representation or warranty, express or implied, is made regarding the accuracy, completeness or correctness of the information contained herein, except as required under applicable law. The information contained in this presentation should not be construed as investment, legal, tax or other professional advice, and no reliance should be placed on it as the basis for any investment decision. This presentation may contain forward-looking statements based on current expectations, estimates, assumptions and projections, including those relating to the business outlook, plans, strategy and future performance of the Company. Forward-looking statements may be identified by terms such as “anticipate”, “expect”, “believe”, “estimate”, “target”, “forecast”, “intend”, “plan”, “may”, “will”, “could” or similar expressions. These statements are not guarantees of future performance and are subject to risks, uncertainties and assumptions, including economic conditions, regulatory changes, market developments, currency fluctuations, compliance-related costs and other factors disclosed in the Company’s filings/disclosures with BSE Limited, National Stock Exchange of India Limited and/or SEBI, as applicable. Actual results may differ materially from those expressed or implied. Certain market, industry and economic information, if any, may be based on publicly available sources and/or third-party reports which have not been independently verified by the Company. The information in this presentation is provided as of the date of this presentation and the Company assumes no obligation to update or revise any information or forward-looking statement, except as required under applicable law. This presentation does not constitute an offer, invitation, solicitation or recommendation to purchase, subscribe for or sell any securities of the Company, nor shall it form the basis of any contract or commitment. This presentation is not a prospectus, offer document, placement document or other issue document under applicable securities laws. Investment in securities involves risks, including possible loss of principal. Viewers should consult their own independent professional advisers before making any investment decision 2 PPuubblliicc ©© 22002266 HHiittaacchhii EEnneerrggyy.. AAllll rriigghhttss rreesseerrvveedd.. License to operate Safety, Integrity and Quality 0.10 1100+ Safety Lifesaving rules inspections performed Total recordable injury frequency rate (TRIFR) – YTD 98.75% Target: 0.09 Integrity High risk hazards closed on time Zero 2000+ Quality Non-Conformance Reports (NCRs) Safety Observation Tours (SOTs) open and overdue performed 3 PPuubblliicc ©© 22002266 HHiittaacchhii EEnneerrggyy.. AAllll rriigghhttss rreesseerrvveedd.. ESG progress against 2030 targets Planet People Principle Segments Progress / 2030 target Segments Progress / 2030 target Segments Commitment / target CO₂ 74% reduction (86% excl. SF₆) emissions Target: 50% reduction Safety Zero-harm commitment Corruption Zero-incident commitment Renewable 100% clean energy operations Electricity 10% gender diversity Diversity achieved 10% reduction Freshwater Target: 16–18% Target: 25% reduction Waste 99.59% waste produced has been disposal¹ processed for recycling Peenya: “Excellence in Waste CRISIL ESG 69 in Sep’26 Key Awards in Q2 Management” Improved ESG rating vs 61 in 2025 FKCCI Awards 2026 Reduction targets vs 2019. ¹ Waste sent to landfill or incineration. 46 PPuubblliicc ©©©© 2222000022226666 HHHHiiiittttaaaacccchhhhiiii EEEEnnnneeeerrrrggggyyyy.... AAAAllllllll rrrriiiigggghhhhttttssss rrrreeeesssseeeerrrrvvvveeeedddd.... India’s energy transition drives grid investment From long term planning to project approval increases conviction for multi year structural opportunity Growth drivers Grid investment catalysts In H1FY27, RE capacity in India reached 299.25 GW (33% of non fossil target of 900 GW Renewables 1 by 2036) PM Dhara GEC Phase III approves investment Rs 1.86 lakh cr (out of 7.93 lakh cr) to Transmission 2 connect 135 GW renewables by the end of the quarter which includes 50 Gwh of BESS Emerging India approves 1150 kV system with an estimated investment of Rs 68,816 crs technologies Data centers Electricity demand from data center could reach 17 GW by 2031-32 Dept of Atomic Energy released draft SHANTI (Sustainable harnessing & advancing of Nuclear 5 nuclear energy for transforming India) rules for advancing framework for pvt sector participation in nuclear power​ SemiCon Industry 6 Rs 1 lakh Crs investment commitments under Semicon 2.0 1.. Renewable 2. Transmission 3 Emerging technologies 4. Data center 5.. Nuclear 6. SemiCon 1.. Renewable 2. Transmission 3 Emerging technologies 4. Data center 5.. Nuclear6. SemiCon PPuubblliicc ©© 22002266 HHiittaacchhii EEnneerrggyy.. AAllll rriigghhttss rreesseerrvveedd.. Solid performance driving growth and building margins Rs Crs Growth Growth Growth Orders in Q2FY27 Particulars Q2FY27 H1FY27 YoY(%) QoQ (%) YoY(%) Orders(with ✓ TBCB: secured four marquee transformers and substation 4,120.8 85.9% -19.1% 9.217.3 -32.0% HVDC) orders from two leading EPC players, including a STATCOM project Orders(witho 85.9% 21.8% 53.1% ut HVDC) ✓ Grid automation: secured multiple orders, including digital substation control for an HVDC project and a generation plant Revenue 2,996.5 63.5% 20.2% 5,490.2 65.8% ✓ Data Centers: secured multiple projects from leading global PBT 430.4 22.0% 10.5% 819.9 54.8% hyperscalers ✓ Service: won multiple orders, including a digitally enabled SLA PAT 318.5 20.5% 8.3% 612.6 54.7% for a major semiconductor customer, providing 24x7 technical support and enhanced operational reliability Op. EBITDA 494.4 69.5% 23.6% 894.3 93.7% ✓ High voltage: A key win in this segment was from Khavda Op. EBITDA South–Olpad HVDC project, comprising a cooling system and 16.5% 16.3% (%) 22 × 420 kV GIS bays, further strengthening our presence in large-scale transmission infrastructure projects. OBL ( As on) 33,335.4 13.3% 3.5% 33.335.4 13.3% 6 PPuubblliicc ©© 22002266 HHiittaacchhii EEnneerrggyy.. AAllll rriigghhttss rreesseerrvveedd.. Powering growth through successful project execution Fatehgarh III Grid automation for leading 33/220 KV AIS Main [Showing first 8,000 characters — download PDF for full document]