BSECompany Update12 Nov 2026 · 12 Nov 2026, 04:36 pm
Please refer the enclosed file
Hitachi Energy India Ltd · 543187
✦ AI SummaryResults
Hitachi Energy India Ltd has released an investor presentation for Q2 FY26-27, highlighting its safety, integrity, and quality performance, as well as its ESG progress and growth drivers in the Indian energy sector.
Analysis Scores
Earnings Impact5/10
Growth Catalyst8/10
Governance Concern2/10
Regulatory Risk3/10
Balance Sheet Risk4/10
Liquidity Impact9/10
Market Sentiment6/10
✦ Ask a Question
Ask anything about this announcement — AI will answer based on the filing content.
Full Announcement
Hitachi Energy India Ltd - 543187 - Announcement under Regulation 30 (LODR)-Investor Presentation
Attachments (1)
📄pdf
Download →
fbc7d8df-a71d-43f1-ae49-540ed0e13a03.pdf
View document text
HITACHI
November 12, 2026
The Secretary, The Manager,
Listing Department, Listing Department,
BSE Limited, National Stock Exchange of India Limited,
1st Floor, Phiroze Jeejeebhoy Towers, ‘Exchange Plaza’, 5th Floor, Plot No. C/1, G Block,
Dalal Street, Bandra Kurla Complex, Bandra (East),
Mumbai - 400 001 Mumbai - 400 051
Scrip Code: 543187 Scrip Symbol: POWERINDIA
Subject: Analysts/Investors’ Presentation
Dear Sir / Madam,
Pursuant to Regulation 30 of the SEBI (Listing Obligations and Disclosure Requirements) Regulations, 2015,
we are enclosing herewith a copy of Presentation to be made during the conference call with
Analysts/Investors as scheduled today i.e., November 12, 2026, for the information of the Stock Exchanges.
The above information is also hosted on the website of the Company at:
https://www.hitachienergy.com/in/en/investor-relations/analyst-section.
Kindly take the same on your records.
Thank you,
Yours faithfully,
For Hitachi Energy India Limited
Poovanna Ammatanda
General Counsel and Company Secretary
Encl.: as above
Hitachi Energy India Limited
Registered and Corporate Office:
8th Floor, Brigade Opus, 70/401,
Kodigehalli Main Road, Bengaluru - 560 092
Email ID: investors@hitachienergy.com
Phone: 080 68473700
CIN: L31904KA2019PLC121597
hitachienergy.com/in
Hitachi Energy India Ltd
Q2 FY26-27 | Analyst
Conference Call
N Venu, Managing Director and CEO
Symbol: POWERINDIA | Scrip code: 543187
12th November 2026
PPuubblliicc ©© 22002266 HHiittaacchhii EEnneerrggyy.. AAllll rriigghhttss rreesseerrvveedd..
Cautionary statement
This presentation has been prepared by Hitachi Energy India Limited (“Company”) solely for information purposes. While reasonable care has
been taken in preparing this presentation, no representation or warranty, express or implied, is made regarding the accuracy, completeness or
correctness of the information contained herein, except as required under applicable law. The information contained in this presentation should
not be construed as investment, legal, tax or other professional advice, and no reliance should be placed on it as the basis for any investment
decision.
This presentation may contain forward-looking statements based on current expectations, estimates, assumptions and projections, including
those relating to the business outlook, plans, strategy and future performance of the Company. Forward-looking statements may be identified
by terms such as “anticipate”, “expect”, “believe”, “estimate”, “target”, “forecast”, “intend”, “plan”, “may”, “will”, “could” or similar expressions.
These statements are not guarantees of future performance and are subject to risks, uncertainties and assumptions, including economic
conditions, regulatory changes, market developments, currency fluctuations, compliance-related costs and other factors disclosed in the
Company’s filings/disclosures with BSE Limited, National Stock Exchange of India Limited and/or SEBI, as applicable. Actual results may differ
materially from those expressed or implied.
Certain market, industry and economic information, if any, may be based on publicly available sources and/or third-party reports which have not
been independently verified by the Company. The information in this presentation is provided as of the date of this presentation and the
Company assumes no obligation to update or revise any information or forward-looking statement, except as required under applicable law.
This presentation does not constitute an offer, invitation, solicitation or recommendation to purchase, subscribe for or sell any securities of the
Company, nor shall it form the basis of any contract or commitment. This presentation is not a prospectus, offer document, placement document
or other issue document under applicable securities laws. Investment in securities involves risks, including possible loss of principal. Viewers
should consult their own independent professional advisers before making any investment decision
2 PPuubblliicc ©© 22002266 HHiittaacchhii EEnneerrggyy.. AAllll rriigghhttss rreesseerrvveedd..
License to operate
Safety, Integrity and Quality
0.10 1100+
Safety
Lifesaving rules inspections performed
Total recordable injury frequency rate
(TRIFR) – YTD 98.75%
Target: 0.09
Integrity
High risk hazards closed on time
Zero
2000+
Quality
Non-Conformance Reports (NCRs) Safety Observation Tours (SOTs)
open and overdue performed
3 PPuubblliicc ©© 22002266 HHiittaacchhii EEnneerrggyy.. AAllll rriigghhttss rreesseerrvveedd..
ESG progress against 2030 targets
Planet People Principle
Segments Progress / 2030 target Segments Progress / 2030 target Segments Commitment / target
CO₂ 74% reduction (86% excl. SF₆)
emissions Target: 50% reduction Safety Zero-harm commitment Corruption Zero-incident commitment
Renewable
100% clean energy operations
Electricity 10% gender diversity
Diversity achieved
10% reduction
Freshwater Target: 16–18%
Target: 25% reduction
Waste 99.59% waste produced has been
disposal¹ processed for recycling
Peenya: “Excellence in Waste
CRISIL ESG 69 in Sep’26
Key Awards in Q2
Management”
Improved ESG rating vs 61 in 2025
FKCCI Awards 2026
Reduction targets vs 2019. ¹ Waste sent to landfill or incineration.
46 PPuubblliicc ©©©© 2222000022226666 HHHHiiiittttaaaacccchhhhiiii EEEEnnnneeeerrrrggggyyyy.... AAAAllllllll rrrriiiigggghhhhttttssss rrrreeeesssseeeerrrrvvvveeeedddd....
India’s energy transition drives grid investment
From long term planning to project approval increases conviction for multi year structural opportunity
Growth drivers Grid investment catalysts
In H1FY27, RE capacity in India reached 299.25 GW (33% of non fossil target of 900 GW
Renewables
1 by 2036)
PM Dhara GEC Phase III approves investment Rs 1.86 lakh cr (out of 7.93 lakh cr) to
Transmission
2 connect 135 GW renewables by the end of the quarter which includes 50 Gwh of BESS
Emerging
India approves 1150 kV system with an estimated investment of Rs 68,816 crs
technologies
Data centers Electricity demand from data center could reach 17 GW by 2031-32
Dept of Atomic Energy released draft SHANTI (Sustainable harnessing & advancing of
Nuclear 5 nuclear energy for transforming India) rules for advancing framework for pvt sector
participation in nuclear power
SemiCon Industry 6 Rs 1 lakh Crs investment commitments under Semicon 2.0
1.. Renewable 2. Transmission 3 Emerging technologies 4. Data center 5.. Nuclear 6. SemiCon
1.. Renewable 2. Transmission 3 Emerging technologies 4. Data center 5.. Nuclear6. SemiCon
PPuubblliicc ©© 22002266 HHiittaacchhii EEnneerrggyy.. AAllll rriigghhttss rreesseerrvveedd..
Solid performance driving growth and building margins
Rs Crs
Growth Growth Growth Orders in Q2FY27
Particulars Q2FY27 H1FY27
YoY(%) QoQ (%) YoY(%)
Orders(with ✓ TBCB: secured four marquee transformers and substation
4,120.8 85.9% -19.1% 9.217.3 -32.0%
HVDC)
orders from two leading EPC players, including a STATCOM
project
Orders(witho
85.9% 21.8% 53.1%
ut HVDC)
✓ Grid automation: secured multiple orders, including digital
substation control for an HVDC project and a generation plant
Revenue 2,996.5 63.5% 20.2% 5,490.2 65.8%
✓ Data Centers: secured multiple projects from leading global
PBT 430.4 22.0% 10.5% 819.9 54.8%
hyperscalers
✓ Service: won multiple orders, including a digitally enabled SLA
PAT 318.5 20.5% 8.3% 612.6 54.7%
for a major semiconductor customer, providing 24x7 technical
support and enhanced operational reliability
Op. EBITDA 494.4 69.5% 23.6% 894.3 93.7%
✓ High voltage: A key win in this segment was from Khavda
Op. EBITDA South–Olpad HVDC project, comprising a cooling system and
16.5% 16.3%
(%) 22 × 420 kV GIS bays, further strengthening our presence in
large-scale transmission infrastructure projects.
OBL ( As on) 33,335.4 13.3% 3.5% 33.335.4 13.3%
6 PPuubblliicc ©© 22002266 HHiittaacchhii EEnneerrggyy.. AAllll rriigghhttss rreesseerrvveedd..
Powering growth through successful project execution
Fatehgarh III Grid automation for leading 33/220 KV AIS Main