BSECompany Update20h ago · 9 Nov 2026, 12:20 pm
Intimation of newspaper publication of financial results.
Mukka Proteins Ltd · 544135
✦ AI SummaryResults
Mukka Proteins Ltd has announced the newspaper publication of its unaudited financial results for the half year and six months period ended 30th September 2026, in compliance with Regulation 47 of the SEBI (Listing Obligations and Disclosure Requirements) Regulations, 2015.
Analysis Scores
Earnings Impact5/10
Growth Catalyst2/10
Governance Concern1/10
Regulatory Risk1/10
Balance Sheet Risk1/10
Liquidity Impact8/10
Market Sentiment5/10
✦ Ask a Question
Ask anything about this announcement — AI will answer based on the filing content.
Full Announcement
Mukka Proteins Ltd - 544135 - Announcement under Regulation 30 (LODR)-Newspaper Publication
Attachments (1)
📄pdf
Download →
baa3454b-b25d-4d20-9489-68f83bae13b5.pdf
View document text
Date: 09-11-2026
National Stock Exchange of India Limited BSE Limited
Exchange Plaza, C-1, Block G Listing Department
Bandra Kurla Complex, Dalal Street,
Bandra East, Mumbai-400051 Mumbai-400001
Scrip Code: MUKKA Scrip Code: 544135
Dear Sir/Madam,
Subject: Newspaper advertisement pursuant to Regulation 47 of the SEBI (Listing
Obligations and Disclosure Requirements) Regulations, 2015.
In compliance with Regulation 47 of the Securities and Exchange Board of India (Listing
Obligations and Disclosure Requirements) Regulations, 2015, we are hereby enclosing copies
of newspaper advertisements of the unaudited financial results (standalone and consolidated)
of the Company for the half year and six months period ended 30th September 2026, published
today i.e. Monday, 9th November 2026, in Business Standard (English) and Vijaya
Karnataka (Kannada).
This is for your information and records.
Thanking you,
For Mukka Proteins Limited
Mehaboobsab Mahmadgous Chalyal
Company Secretary & Compliance Officer
Membership No.: A67502
Encl: as above.
Premium K-12 school market Nasa’s Swift burns up, highlighting
challenges of boosting satellites
moves into investor top class
wanjikuchebetkanjumba withtrade-offs.Inengineer-
Realtydevelopersjointherollcallasschoolinfradrawslong-termcapital Gainesville,8November ing,acompressedschedule
can leave less time for
Nasa’s Neil Gehrels Swift repeated testing, building
auhonamukherjee& 6,000squaremetresofland, Observatorytookitslastlook sparehardwareandplanning
akshatayush dependingonthelevelofthe attheskyonOctober20,2026, recovery options. Public
NewDelhi,8November schoolanditslocation,along whileorbitingabout275kilo- reports do not say whether
with prescribed playground metresaboveEarth. thattrade-offplayedanypart
India’spremiumK-12(kinder- facilities,thereportsaid. Nasaendedthetelescope’s inLINK’sfaults.
gartentoClass12)education DhirendraMishra,founder mission three days later, Nasa has said that even
market is attracting growing anddirectorofLIFEEducare, becauseSwifthadsunksolow thoughLINKdidn’tsucceed,
interest from institutional whichoperatestheschoolreal that drag from the thin air the effort gave the agency
investorsandrealestatedevel- estate advisory platform there meant its telescopes experienceinquicklybuild-
opers,withschoolinfrastruc- SchoolXchange,saidthesep- couldn’tholdsteady.Thetele- ing,launchingandoperating
tureemergingasalong-term arationofpropertyownership scope reentered the atmos- aservicingspacecraft.
investmentopportunity.Inves- andschooloperationswasan phereonNovember4above Engineers also showed
torsareexploringpartnerships establishedpractice,including theNorthSumatraregionof theycoulduploadnewcontrol
withestablishedschoolchains amongCBSE-affiliatedinstitu- Indonesiaandlargelyburned softwaretosteadyadamaged
and international education tions. Typically, developers up,anabruptendingtotwo ThespecialrescuespacecraftLINK,whichflewonafailed servicingspacecraftwiththe
brands,evenasthetraditional leasedlandandbuildingsto decades spent observing missiondesignedtoextendthelifeofNasa’sNeilGehrels hardwareithadleft.AndLINK
model of developers leasing trustsforaround15years,with powerfulcosmicexplosions. SwiftObservatory filephoto:reuters testeditsarmsandfiredall
propertiestoschool-operating provisions to extend the Swift’sreentrycomesafter threethrustersatonceinorbit.
trustsremainsprevalent. arrangement,hesaid. afailedrescuemissioninthe Withoutworkingwheels,a lefttotowithome.
Vinod Kakumani, CEO of Alongsideinvestorinterest, summerof2026.LINK,acom- spacecraft steers with its That scenario is close to Whatcomesnext
SchoolServe, which operates limitedavailabilityofsuitable mercial robotic spacecraft thrustersinstead,andevery whathappenedtoLINK.Even While Swift was the most
theschoolrealestateplatform landinmajorcitiesisinfluenc- senttoraiseSwiftintoasafer burnspendspropellant. after engineers brought its pressing case for a boost
SchoolProp,saidsomeinves- ing how school operators orbit,reenteredEarth’satmos- Engineers eventually spinundercontrol,Katalyst mission,it’snottheonlyone.
torswereexploringathree-tier expand. Kakumani said phere in September. The slowed LINK’s rotation by saidthespacecraftnolonger Nasa’s Hubble Space Tele-
structure involving separate demandforpremiumschools machinedesignedtosavea firingitsthrustersagainstthe hadenoughpropellanttocap- scope could one day use a
property, management, and wasparticularlystronginBen- fallingsatelliteburnedupfirst. spin.NasareportedinAugust tureSwiftandraiseitsorbit similar boost, and news
operatingentities.“Themost galuru,Hyderabad,Pune,and AsaPhDcandidateinaero- that safely. A reports suggested it would
popularstructureforinvestors the Delhi-National Capital spaceengineering,Iknowthat they fuel havebeennextinlinehadthis
intheK-12segmentistohavea Region,buttheavailabilityof rescuing satellites is hard. I had budget missionworked.
developerthatownstheland land was increasingly con- research how spacecraft cutits that Futuremissionsarepur-
andbuildingandatrustthat strainingnewdevelopment. approachandcapturesatel- spinfromaboutninedegrees coversonlytheplannedsteps suing two complementary
runs the operations of the “Forexample,withalackof lites, including objects that persecondtoroughlyoneand leavesnothingforrecovering approachesforrescuingsatel-
school.However,nowadaysa available land in Mumbai, tumbleuncontrollably. ahalfdegreespersecond. fromafault.Buteveryextra lites.Astroscale’sELSA-Mis
three-tierownershipstructure enuearrangements. generatingK-12schoolandstu- schoolsarecomingupinNavi Swift’slosspointstoanew NasaandKatalystSpace, pound of propellant also builttocapturesatellitesthat
isalsoemerging,whereaprop- “We expect developers to denthousingassets. Mumbai,Thane,etc.,tomeet hazardfortheyoungindustry LINK’sbuilder,calledoffthe makes a spacecraft heavier, carryadockingplateinstalled
ertycompany,amanagement partnermorewithestablished Investorinterestisgrowing thedemand.Onourportal,we thatrepairs,refuelsandmoves capture and boost later in and heavier spacecraft cost beforelaunch,whichwould
company, and an operating schooloperatorsandinterna- amidrisingdemandforprivate seethatthedemandforsuch spacecraftaroundinorbit.If August. The team still flew moretolaunchandtakemore makeiteasierforarescuerto
entityexisttogether,”hesaid. tional education brands. As education infrastructure. A schools is increasing, but something goes wrong, the LINK within 12 to 15 kilo- fueltomove. snagandboostthemifthesat-
Despitethescaleofprivate theseplatformsexpandacross CBRE report published in supplyisnotenough,withvery spacecraftdoingtherescuing metres of Swift, where it ellite eventually got into
education, the infrastructure coreurbanmarketsandinto OctoberestimatedthatIndia littlelandforfurtherconstruc- canbecomeanotherproblem. deployedLINK’sthreerobotic Speedbuystimeandcosts trouble.TheEuropeanSpace
servingthesectorremainsfrag- selectTier-IIcities,education wouldrequireanadditional1- tionofschoolsandbuildings,” arms and tested its electric backup Agency’s ClearSpace-1 is
mented and under-invested, realestatecouldgrowintoan 1.5billionsquarefeetofprivate Kakumanisaid.Headdedthat Therescuerstarted thrusters. It never got close Startingin2024,solaractivity plannedfor2029andaimsto
creatinganopportunityforinsti- institutional segment, rather education infrastructure by internationaleducationgroups spinning enoughtograbthetelescope. swelledEarth’supperatmos- capturetheProba-1satellite,
tutionalcapital,saidAnshuman thanstayingthefragmented, 2034-35,drivenbyrisingenrol- werealsoscoutingforexisting The plan was for LINK to phere, and the extra drag whichdoesn'thaveadocking
Magazine,chairmanandchief promoter-driven market it ment, greater private-sector schoolswhoseoperationsthey approachSwift,grabitwith Fuelistherescuebudget pulledSwiftdownfasterthan plate or anything to help
executiveofficer(CEO)forIndia, largelyistoday,”headded. participation, and growing could take over in locations oneofi
[Showing first 8,000 characters — download PDF for full document]