NSEInvestor Presentation19h ago · 9 Nov 2026, 11:38 am
Investor Presentation
Fujiyama Power Systems Limited · UTLSOLAR
✦ AI Summary▲ PositiveResults
Fujiyama Power Systems Limited has informed the Exchange about Investor Presentation, which includes details on the company's performance, manufacturing expansion, and backward integration initiatives.
Analysis Scores
Earnings Impact8/10
Growth Catalyst9/10
Governance Concern1/10
Regulatory Risk2/10
Balance Sheet Risk6/10
Liquidity Impact9/10
Market Sentiment8/10
✦ Ask a Question
Ask anything about this announcement — AI will answer based on the filing content.
Full Announcement
Fujiyama Power Systems Limited has informed the Exchange about Investor Presentation
Attachments (1)
📄pdf
Download →
UTLSOLAR2024_09112026113724_Investor_Presentation_SeptQtrResults.pdf
View document text
SUTL SOLAR
November 09, 2026
The Manager The Manager
Listing Department Listing Department
National Stock Exchange of India Limited BSE Limited
Exchange Plaza, C-1, Block G Phiroze Jeejeebhoy Towers
Bandra Kurla Complex Dalal Street, Fort
Bandra (E), Mumbai 400 051 Mumbai 400 001
Maharashtra, India Maharashtra, India
Scrip Symbol: UTLSOLAR Scrip Code: 544613
Subject: Analysts/ Investors Presentation
Dear Madam/ Sir,
Pursuant to Regulation 30 of the Securities and Exchange Board of India (Listing Obligations and
Disclosure Requirements) Regulations, 2015 (“Listing Regulations”), we hereby enclose a copy of the
presentation proposed to be made at the Analysts’/ Investors’ meet scheduled to be held on November
10, 2026, for the information of the Stock Exchanges.
The above information shall also be made available on the website of the Company at:
https://www.utlsolarfujryama.com/.
Kindly take the information on record.
Thanking you,
Yours Sincerely,
For Fujiyama Power Systems Limited
(Formerly Fujiyama Power Systems Private Limited)
MAY URI »Dyi gimtaalvluy risi gned
GUPTA
GUPT Date: 2026.11.09
11:19:23 +05'30"
Mayuri Gupta
Company Secretary and Compliance Officer
M. No.: A75210
Encl: As above
FULUTYAMA POWER SYSTEMS LIMITER
(Formerly Fujiyama Power Systems Private Limited)
53.4/6, Near NDPL Grid Office, Near Metro Station, Industrial Area,
Sat Guru Ram Singh Marg, Delhi - 110015, India
CIN - L31909DL2017PLC326513, GST No - OFAADCFIG3I4FIZY
www.utlsolarfujiyama.com : +91 9968309514, 9968309517, E-mail: investor(@utlsolarfujiyama.com
FU. YAMA
SOLA
0A AE A
(OOO 00 0 A no
LO A A a
COA A A
Gah ea ea a
Q2 FY2027
(NSE: UTLSOLAR; BSE: 544613)
aaa ma aeciiele
© UTL SOLAR
Powering India with an Integrated Energy Future
FUAIYAMG
Customers Benefit From Uninterrupted Electricity Supply and Return On Investment SOL fii?
Residential Rooftop Solutions (B2C)
Solar Panel
Tastee as Bye} AKsl a (Sts DIKldb aele s | States and UTs |
Inverters/ PCU Lithium-ion / Tubular © Mono PERC / TOPCon wi f Boos Be
E-Rickshaw A er PWM Solar
Chargers Charge Controller
Off Grid Te
i | ny Solar Management Shoppes End Customers
Unit
b a=
1.4 Million+
” Power Supply Solutions In last 5 FY
Hybrid Charge B2C Revenue
Controller Unit
Power Backup Solutions
On Grid
Alfa Online UPS 3 Phase online UPS
Service Engineer
Feedback from Service Feedback from Service
80+ 5
Engineers to R&D Team Engineers to R&D Team 1,000+
R&D Engineers Intellectual Propert y
< Real Time Feedback
Rights (+4 Applied) Gives In-Person Sal es Support
Industry First
to Dealers/ Shoppes
rMPPT Technology, Combo UPS, Online Solar PCU
* Also includes Marine/Engine Start Chargers
Backward Integration to Address Domestic Content Requirement “DCR” Driven Demand ©UTL SOLAR
FUAV\Y AMG
SOL fii?
Expanding into DCR-Compliant Solar Cell Manufacturing to Capture Growing On-grid Rooftop Solar Demand Under
PM Surya Ghar Muft Bijli Yojana (“PMSGMBY”)
PM Surya Ghar Muft Bijli Yojana continues to scale residential solar
adoption, With over 3.5 million* households still to cover, this
represents close to 10 GW+ of incremental opportunity
Execution Progress
says fe issi 1 GW Mono PERC solar cell facturing facili
Rs. 36,000 Cr+ 6 Million + 19 GW + Commissioned G ono C sO ar ce manu acturing acility
at Dadri to capture domestic, subsidy driven on grid rooftop solar
Subsidy Released Direct Household Capacity market
to End Customers Covered installed
i; os Announced 1.2 GW TOPCon solar cell manufacturing capacity at
pee ne ee eee een ; Ratlam, improving product competitiveness
Two main conditions for subsidy under PMSGY ! | * Transitioning from import dependence to in-house manufacturing
& DCR-compliant solar panel 3 ! to ensure supply reliability and cost control
eo On-grid or hybrid solar inverter : © Strengthens end-to-end integration across the solar value chain,
improving cost control, margins and execution capabilities
¢ Positions the company to accelerate growth in the expanding on-
grid residential segment
Swe eee eee ee ee eee ee ee ee ee ee ee ee ee ee ee ee ee ee ee ee ee ee ee ee ee ee ee ee ee eet
Source: PIB , https://omsuryaghar.gov.in/#/state-ut-wise-progress/; *As on 31% October 2026 3
<SUTL SOLAR
Management Commentary
FUSVYEMA
Commenting on the performance Mr. Pawan Kumar Garg, Chairman and Joint Managing Director, said: SOL flit
“The second quarter of FY27 marked further progress in Fujiyama’s manufacturing expansion and backward integration initiatives. The Company
made progress in building an integrated manufacturing platform across solar panels, power electronics and batteries. The demand environment for
residential rooftop solar and power backup solutions remains favourable, supported by government initiatives, increasing consumer awareness and
wider adoption across Tier 2 and Tier 3 markets.
The Company delivered strong growth in Q2 FY27, with Revenue up 130.1% and EBITDA up 116.4% YoY, both more than doubling over Q2 FY26. This
was driven by significantly higher sales volumes, supported by our PAN India network of on roll service engineers and a conscious strategy of passing
on cost benefits to customers through competitive pricing to expand market share. The Q2 FY27 results also absorbed overheads at the Ratlam
facility, incurred ahead of the production ramp up of our recently commissioned panel and inverter division, which contributed to the moderation in
EBITDA Margin to 17.1% (from 18.1%).
Our distribution network remains an important part of our business model, enabling us to reach customers across a wide range of markets. During
the quarter, we added more than 30 distributors and 100 dealers, taking our total channel partner base to over 10,200 as of September 30, 2026.
On the manufacturing front, we commissioned our 2 GW power electronics manufacturing facility at Ratlam during the quarter. The facility
Q2 FY27 Revenue from
| Manufactures solar inverters, UPS systems and other related power electronics products. With this addition, our total power electronics
Operations I manufacturing capacity has increased to 4.1 GW.
L _Rs. 13,068 Mn 130.1% YoY _| We are also progressing with the development of our lithium-ion battery manufacturing facility at Ratlam, with 3 GWh of manufacturing capacity
8 expected to come online in the coming quarter. The addition will strengthen our in house manufacturing capabilities and support the growing
7 requirement for energy storage solutions. It will also improve integration across our solar and power backup product portfolio.
Q2 FY27 EBITDA In addition to lithium-ion batteries, we are rebuilding our in house tubular battery manufacturing capabilities through a proposed 1 GWh facility at
I Rs. 2,229 Mn 116.4% YoY ; Hathras, Uttar Pradesh. The facility is being established as a replacement for the earlier 1.3 GWh capacity at Bawal, Haryana, which was damaged in
Li~~~~~—~~~~~—~~~—-+—--- ' a fire incident in May 2026. The facility is expected to be commissioned by Q3 FY2027. It will provide a dedicated manufacturing base for tubular
pee ee eee eee ee eee , _ batteries, strengthen our manufacturing presence in North India and support supplies to our established distribution network.
10,200+ Alongside these initiatives, the 1.2 GW TOPCon solar cell manufacturing facility at Ratlam remains on track for commissioning by Q1 FY2028. The
, facility will complement our existing 1 GW solar cell manufacturing capacity and support our participation in the Domestic Content Requirement
; Channel Partners y P 6 6 capaci PP Pare 4
I | (DCR) segment.
Loe eee eee eee ee ee I
Looking ahead, we see opportunities across residential rooftop solar and energy storage. The PM Surya Ghar initiative and its proposed expansion
= = = : : 1 under PM Surya Ghar 2.0 could support wider adoption of rooftop solar and integrated storage solutions. As we move forward, our focus will remain
I Upcoming Capacity I ; a: ; as ; ; ;
I j On ramping up manufacturing capacities, expanding our distribution reach and strengthening
[Showing first 8,000 characters — download PDF for full document]