NSEOutcome of Board Meeting4d ago · 5 Nov 2026, 06:52 pm
Outcome of Board Meeting
Fujiyama Power Systems Limited · UTLSOLAR
✦ AI SummaryResults
Fujiyama Power Systems Limited has submitted its unaudited standalone and consolidated financial results for the quarter and half year ended September 30, 2026, along with the Limited Review Reports of the Statutory Auditors.
Analysis Scores
Earnings Impact8/10
Growth Catalyst5/10
Governance Concern2/10
Regulatory Risk1/10
Balance Sheet Risk6/10
Liquidity Impact9/10
Market Sentiment6/10
✦ Ask a Question
Ask anything about this announcement — AI will answer based on the filing content.
Full Announcement
Fujiyama Power Systems Limited has submitted to the Exchange, the financial results for the period ended September 30, 2026.
Attachments (1)
📄pdf
Download →
UTLSOLAR2024_05112026185058_NSE_BSE_Outcome_Board_Meeting_05_11_2026_final.pdf
View document text
:UTLSOLAR
E. I==I
November 05, 2026
The Manager The Manager
Listing Department Listing Department
National Stock Exchange of India Limited BSE Limited
Exchange Plaza, C-1, Block G Phiroze Jeejeebhoy Towers
Bandra Kurla Complex Dalal Street, Fort
Bandra (E), Mumbai 400 051 Mumbai 400 001
Maharashtra, India Maharashtra, India
Scrip Symbol : UTLSOLAR Scrip Code: 544613
Subject: Outcome of the Board Meeting held today i.e. November 05, 2026
Dear Madam / Sir,
With reference to the captioned subject, we wish to inform you that, pursuant to Regulation 30 and
other applicable provisions of the Securities and Exchange Board of India (Listing Obligations and
Disclosure Requirements) Regulations, 2015 (“SEBI Listing Regulations”), the Board of Directors
of Fujiyama Power Systems Limited (“the Company”), at its meeting held today, i.e., Thursday,
November 05, 2026, upon the recommendation of the Audit Committee, has considered and
approved the Unaudited Standalone and Consolidated Financial Results of the Company for the
quarter and half year ended September 30, 2026, along with the Limited Review Reports of the
Statutory Auditors thereon, which are enclosed herewith.
The meeting commenced at 04:00 P.M. (IST) and concluded at 05:30 P.M. (IST).
The above information is also being made available on the website of the Company at
https://www.utlsolarfujiyama.com/
Kindly take the same on record.
Thanking you,
Yours faithfully,
For Fujiyama Power Systems Limited
(Formerly Fujiyama Power Systems Private Limited)
MAYURI Digitally signed by
MAYURI GUPTA
GUPTA Date: 2026.11.05
17:58:51 +05'30'
Mayuri Gupta
Company Secretary and Compliance Officer
M. No.: A75210
Enc: As above
FUJIYAIWA POWER SYSTEMS LIMITED
(Formerly Fujiyama PowerSystems Private Limited)
53A/6, NearNDPI..GridOflicc.NearMetroStation. IndustrialArea.
Sat Guru Ram Singh \larg, Delhi llools, India
CIN - l.31909DL2017PLC326513. GSTNo- 07AADCF2634FlZY
+91 99683095l4, 99683095I7, E-mail: investorqiutlsolarfujiyamancom
S N Dhawari 8: CO LLP 51-52, Sector 18, Phase-IV, Udyog Vihar,
Gurugram, Haryana 122016, India
Tel +91 124481 4444
Review Reporton Unaudited Standalone Financial Results
To the Board of Directors of Fujiyama Power Systems Limited (formerly known as Fujiyama Power
Systems Private Limited)
1. Wehavereviewedtheaccompanying statementofunaudited standalonefinancial resultsofFujiyama Power
Systems Limited ("theCompany")forthequarterand halfyearended 30 September2026 ("theStatement"),
being submitted by the Company pursuant to the requirements of Regulation 33 of the Securities and
Exchange BoardofIndia(Listing Obligationsand Disclosure Requirements) Regulations, 2015,asamended
(the "Listing Regulations").
2. This Statement, which is the responsibility ofthe Company's Management and approved by the Board of
Directors, has been prepared in accordancewith the recognition and measurement principles laid down in
Indian Accounting Standard 34 'Interim Financial Reporting' ('Ind AS 34'), prescribed underSection 133 of
the Companies Act, 2013 ("the Act"), other accounting principles generally accepted in India and in
compliance with Regulation 33 ofthe Listing Regulations. Our responsibility is to express a conclusion on
the Statementbased on ourreview.
3. Weconducted ourreviewoftheStatementinaccordancewiththeStandardon ReviewEngagements (SRE)
2410'ReviewofInterim Financial InformationPerformed bythe IndependentAuditoroftheEntity', issued by
the Institute ofChartered Accountants ofIndia. A review ofinterim financial information consists ofmaking
inquiries, primarilyofpersons responsible forfinancial and accounting matters, and applying analytical and
otherreviewprocedures. Areviewis substantially less in scopethan an auditconducted in accordancewith
Standards on Auditing and consequently does not enable us to obtain assurance that we would become
aware ofall significant mattersthatmight be identified in an audit. Accordingly, wedo notexpress an audit
opinion.
4. Based on ourreviewconducted as above, nothing has come to ourattention thatcauses us to believe that
theaccompanying Statement, prepared in accordancewiththerecognitionand measurementprinciples laid
down in theaforesaid Ind ASandotheraccounting principles generallyaccepted in India, has notdisclosed
theinformation requiredto be disclosed intermsofRegulation33 ofthe Listing Regulations, 2015, including
the mannerinwhich itis to bedisclosed, orthatitcontains any material misstatement.
5. Wedrawattentionto note no. 3 oftheaccompanying Statement, which statesthata majorfirebroke outon
06 May 2026 in one ofthe Company's production facilities located in Bawal, District Rewari, Haryana. The
incidentresultedin damageto building structures, plantand machineryand inventories havinganaggregate
carrying valueofRs. 1,435.81 million, which has been recognised as an exceptional item in the Statement,
forthe reasons stated inthesaid note. Ourconclusion is notmodified in respectofthis matter.
ForS N Dhawan & CO LLP
CharteredAccountants
IFtirm Registration No.; 000050N/N500045
I '1 0- . ,A /
ul Singhval
Partner
Membership No.: 096570 GURUURAM
UDIN No.: v»m1o .-r ._£>']i ir,-Vli§'*~IW§l-4- 9¢ . *
Place: Gurugram
Date: 05 November2026
SNDhawan&COLLPisregisteredwithlimitedliabilitywithidentificationnumberAAH-1125anditsregisteredofficeis108,MercantileHouse,15KasturbaGandhlMarg.NewDelhl110001,India
s N Dhawa 412 n & co LLP 51-52, Sector 18, Phase-Iv, Udyog Vihar,
Gurugram, Haryana 122016, India
..in a...I Tel +91 124 481 4444
Review Reporton Unaudited Consolidated Financial Results
To the Board of Directors ofFujiyama Power Systems Limited (formerly known as Fujiyama Power
Systems Private Limited)
1. Wehave reviewedtheaccompanying statementofunauditedconsolidatedfinancial resultsofFujiyama
Power Systems Limited ("the Holding Company") and its share of the net loss after tax & total
comprehensive loss of its associates for the quarter and half year ended 30 September 2026 ("the
Statement"), being submitted bythe Holding Company pursuanttothe requirementofRegulation 33 of
theSecuritiesand Exchange BoardofIndia("SEBI") (ListingObligationsand DisclosureRequirements)
Regulations, 2015, as amended ("Listing Regulations").
2. This Statement, which is the responsibility ofthe Holding Company's Management and approved by
the Holding Company's Board of Directors, has been prepared in accordance with the recognition and
measurementprinciples laid down in IndianAccounting Standard 34 'Interim Financial Reporting' ("lnd
AS 34") prescribed under Section 133 of the Companies Act, 2013 ("the Act"), other accounting
principles generally accepted in India and in compliancewith Regulation 33 ofthe Listing Regulations.
Our responsibility is to express a conclusion on the Statementbased on ourreview.
3. We conducted our review ofthe Statement in accordancewith the Standard on Review Engagements
(SRE) 2410, 'Review of Interim Financial Information Performed by the Independent Auditor of the
Entity', issued by the Institute of Chartered Accountants of India. A review of interim financial
information consists ofmaking inquiries, primarily of persons responsible forfinancial and accounting
matters, and applying analytical and other review procedures. A review is substantially less in scope
than an auditconducted in accordancewith Standards on Auditing and consequently does notenable
us to obtain assurance thatwe would become aware ofall significant matters that might be identified
in an audit. Accordingly, we do notexpress an auditopinion.
Wealsoperformed procedures in accordancewith thecircularissued bytheSEBI underRegulation 33
(8) ofthe Listing Regulations, tothe extentapplicable.
4. The Statement includes the results ofthe following entities:
a) Fujiyama PowerSystems Limited ("the Holding Company")
b) Zayo Cables Private Limited ("theAssociate Company w.e.f25 April 2026")
c) Zayo Energy Private Limited ("theAssociate Company w.e.f25 April 2026")
5. Based on ourreviewconducted and procedures pe
[Showing first 8,000 characters — download PDF for full document]