NSEInvestor Presentation6d ago · 5 Nov 2026, 05:42 pm
Investor Presentation
Patel Engineering Limited · PATELENG
✦ AI SummaryResults
Patel Engineering Limited has submitted an investor presentation for the quarter and half year ended September 30, 2026, highlighting key financials and operational updates, including successful breakthroughs in irrigation tunnel projects, completion of hydroelectric power projects, and order intake and backlog details.
Analysis Scores
Earnings Impact6/10
Growth Catalyst4/10
Governance Concern1/10
Regulatory Risk1/10
Balance Sheet Risk2/10
Liquidity Impact8/10
Market Sentiment6/10
✦ Ask a Question
Ask anything about this announcement — AI will answer based on the filing content.
Full Announcement
Patel Engineering Limited has informed the Exchange about Investor Presentation
Attachments (1)
📄pdf
Download →
PATELENG_05112026174159_SEintimationInvestorPresentation.pdf
View document text
November 5, 2026
BSE Limited The National Stock Exchange of India Limited
Phiroze Jeejeebhoy Towers, Exchange Plaza,
Dalal Street, Bandra - Kurla Complex,
Mumbai - 400 001 Mumbai - 400 051
Company Code No. 531120 Company Code: PATELENG
Dear Sir/Mam,
Subject: Submission of Investor/ Analysts Presentation
Please find enclosed herewith the Investor/ Analysts presentation on the Financial Results of
Patel Engineering Limited for the quarter and half year ended September 30, 2026.
This presentation is being submitted in compliance with Regulation 30(6) of the SEBI (Listing
Obligations and Disclosure Requirements), Regulations, 2015.
The same is also being made available on the Company’s website www.pateleng.com
You are requested to take the same in your records.
Thanking you,
Yours truly,
For Patel Engineering Ltd.
Shobha Shetty
Company Secretary and Compliance Officer
Membership No. F10047
Encl: As above
Patel Engineering Limited
INVESTOR PRESENTATION
April, 2026
INVESTOR PRESENTATION
Q2/H1-FY27
Snapshot
75 +
350+ INR 1,35,464 Mn
Years of Industry
Projects Executed Total Order Book
Presence
87+ 300+ 15,000+
Dams Constructed KM Tunnels MW Hydro Project
52 5.5+
States – Domestic
Ongoing Projects Lakh Acres Irrigated
Presence
2.72 2 1,200+
Book-to-Bill Nepal & Bhutan – KM of Roads
(Q2/H1 FY27) International Presence Developed
Investor Presentation 2
Q2/H1-FY27
PERFORMANCE
Key Financials and Operational Highlights
Q2-FY27 Consolidated Performance Q2 FY27 – Key Highlights
Revenue from
OP. EBITDA OP. EBITDA Margin Achieved successful breakthrough of ~12 km irrigation tunnel at
Operations
the Sleemanabad project using a 10m dia. TBM
INR 12,107 Mn INR 1,503 Mn 12.41%
0.2% YoY (5.3)% YoY (72) Bps YoY Subansiri Hydropower Project reaches 1,250 MW operational
capacity with the recent commissioning of unit 5, and works for
PAT# PAT Margin # Diluted EPS units 7 and 8 progressing at a steady pace
INR 833 Mn 6.88% INR 0.82/Share
Kiru Hydropower Power achieved 12 lakh cubic meters of dam
7.8% YoY 48 Bps YoY 5.1% YoY
concreting works out of a total of 12.50 lakh cubic meters
H1-FY27 Consolidated Performance
Kwar Hydropower Power achieved 4 lakh cubic meters of dam
concreting works out of a total 7.50 lakh cubic meters
Revenue from
OP. EBITDA OP. EBITDA Margin
Operations
Non-Core Asset Monetization: Executed the transfer of our entire
INR 24,914 Mn INR 3,299 Mn 13.24% 32% equity stake in ACP Tollways Pvt Ltd., an associate company
2.0% YoY 1.8% YoY (3) Bps YoY for a cash consideration of INR 550 Mn.
PAT# PAT Margin # Diluted EPS
INR 1,767 Mn 7.09% INR 1.75/Share
15.9% YoY 85 Bps YoY 4.8% YoY
Note: #PAT includes Other Comprehensive Income and is adjusted for Non-Controlling Interest, representing Net Profit attributable to Owners of the Parent.
Investor Presentation 4
Key Operational Updates – Q2 FY27 (1/2)
SubansiriLower Hydropower Project
Commencement of Wet Commissioning of Unit 7 - Commencement of Machine Hall Floor and Unit 8 - Commencement of Turbine Floor and
Unit 5 (250 MW) Generator Floor concreting works Generator Floor concreting works
Sleemanabad Carrier Canal Project
Achieved successful breakthrough of the ~12 km long Shri Mohan Yadav, Hon’ble Chief Minister of Madhya
Achieved 8.9 Million Safe Man Hours at the project
irrigation tunnel project using TBM Machine Pradesh, visited project site and reviewed progress
Investor Presentation 5
Key Operational Updates – Q2 FY27 (2/2)
Kiru Hydropower Project
12 lakh cubic meters of dam concreting achieved out Advancing toward Dam completion with the Power House slab concreting works complete
of a total target of 12.50 lakh cubic meters commencement of Deck Slab concreting works following the final pour at Unit-4’s service floor
Kwar Hydropower Project
Excavation Completed for all 4 Power House units.
4 lakh cubic meters of dam concreting achieved out TRT Outlet Bridge Inaugurated & Commencement of
Unit 2 & 3 Raft Concreting completed and wall
of a total target of 7.50 lakh cubic meters the Draft Tube erection works.
concreting in progress
Investor Presentation 6
Awards & Accolades
Maharashtra’s Best Employer Brand 18th IEI Industry Excellence Award 2026 (Gold):
Awards 2026 Construction Engineering Organizations
Hydro Vibhushan Award: Kavita Shirvaikar, Best Hydropower EPC Enterprise of INDIA-18th INDIA
Hydropower’s First Woman Business Leader Hydro & PSPs Awards 2026
Investor Presentation 7
Order Intake & Order Backlog
Order Intake (At the end of each year, Values in INR. Mn) H1-FY27 Segmental Order Intake – INR 645 Mn
50000
44,009
45000 40,742
40000
35000
30000
25000
20000
15000
10000
5000 1,112 645
Irrigation,
100.00%
FY24 FY25 FY26 H1-FY27
Order backlog (At the end of each year, Values in INR. Mn) H1-FY27 Segmental Order backlog – INR 1,35,464 Mn
Urban Infrastructure &
200000 Others, 16.70%
1,86,630
190000
1,75,850
180000 Road, 1.61%
170000
160000 1,50,115 1,52,176 1,51,193 Tunnel, 3.57%
150000
1,35,464
140000
130000
Irrigation,
120000
14.48%
110000 Hydroelectric, 63.64%
100000
FY22 FY23 FY24 FY25 FY26 H1-FY27
Investor Presentation 8
Total Order Book
Segment Wise Order Book Client Wise Order Book Project Completion Status
5.89% 3.56%
2.91%
15.85%
16.70%
1.61%
3.57%
41.15%
28.80%
16.36%
14.48% 62.40%
63.64%
17.75%
5.33%
Hydroelectric Irrigation Central Government / PSU’s State Government
Below 10% 10% - 30% 30% - 50%
Tunnel Road International Others
50% - 70% 70% - 90% 90% - 100%
Urban Infrastructure & Others
No. of Order Book No. of Order Book Completion Order Book Value
Segment Segment No. of Projects
Projects Value (Mn) Projects Value (Mn) Stage (Mn)
Hydroelectric 18 86,204 Below 10% 8 55,741
Central Government /
17 84,531
Irrigation 20 19,620 PSU’s 10% - 30% 4 7,219
Tunnel 4 4,839
State Government 31 39,014 30% - 50% 4 24,046
Road 5 2,180
50% - 70% 9 22,165
International 2 3,937
Urban
70% - 90% 18 21,472
Infrastructure & 5 22,621 Others 2 7,982
Others 90% - 100% 9 4,821
Total 52 1,35,464
Total 52 1,35,464 Total 52 1,35,464
Investor Presentation 9
Geographical Presence & Order Book Split
52 Ongoing Projects spread across 14 states domestically and also
International presence in Nepal and Bhutan with a total project value
Jammu and
Kashmir of INR 1,35,464 Mn
Domestic
Himachal
Pradesh Arunachal Sr.No. State No. of Projects Project Value (INR Mn.)
Pradesh 1 Jammu and Kashmir 5 25,119
2 Arunachal Pradesh 3 24,291
Sikkim
Nepal
3 Maharashtra 15 21,278
Bhutan
4 Himachal Pradesh 4 21,145
Rajasthan Assam Nagaland
5 Madhya Pradesh 10 19,869
Bihar
6 Sikkim 2 9,583
West 7 Karnataka 3 2,429
Madhya Pradesh Bengal
8 Assam and Arunachal Pradesh 1 1,784
9 Nagaland 1 1,754
9 West Bengal & Sikkim 1 1,457
Maharashtra
10 Rajasthan 1 1,338
11 Tamil Nadu 2 774
Telangana
13 Bihar 1 498
14 Telangana 1 207
Total 50 1,31,526
Karnataka
International
Tamilnadu Sr.No. Country No. of Projects Project Value (INR Mn.)
1 Bhutan 1 2,136
2 Nepal 1 1,802
Total 2 3,938
Investor Presentation 10
Quarterly Consolidated Income Statement
Particulars (INR Mn) Q2-FY27 Q2-FY26 Y-o-Y Q1-FY27 Q-o-Q
Revenue From Operations 12,107 12,085 0.2% 12,807 (5.5)%
Total Expenses 10,604 10,498 1.0% 11,011 (3.7)%
Operating EBITDA 1,503 1,587 (5.3)% 1,796 (16.3)%
EBITDA Margins (%) 12.41% 13.13% (72) Bps 14.02% (161) Bps
Depreciation and Amortization 248 262 (5.3)% 265 (6.4)%
Finance Costs 660 760 (13.2)% 618 6.8%
Other Income 477 632 (24.4)% 254 87.8%
Profit Before Exceptional Items And Tax 1,072 1,196 (10.4)% 1,168 (8.2)%
Exceptional Item - (309) NA - NA
PBT 1,072 887 20.9% 1,168 (8.2)%
Tax 199 240 (17.1)% 248 (19.8)%
PAT 873 647 34.9% 920 (5.1)%
PAT Margins (%) 7.21% 5.36% 186 Bps 7.18% 3 Bps
Share in Profit / (Loss) In Associates (Net) (4) 83 NA 65 NA
PAT (Incl. Share of Associates/JV) 869 730 19.0% 985 (11.8)%
Other Comprehensive Income (25) 63 NA (35) 28.6%
Non Controlling Interest 11 20 (45.0)% 15 (26.7)%
Net Profit for Owners of Parent 833 773 7.8% 935 (10.9)%
Diluted EPS 0.82 0.78 5.1% 0.94 (12.8)%
Investor Presentation 11
Half Yearly Consolidated Inco
[Showing first 8,000 characters — download PDF for full document]