✦ AI Summary▲ Positiveinvestor_relations
NTPC Limited has informed the Exchange about Investor Presentation, which includes details on the company's vision, mission, and core values, as well as its operational capacity, installed capacity, and growth in power consumption. The presentation highlights the company's commitment to providing reliable power and energy transition solutions in an economical, efficient, and environment-friendly manner.
Analysis Scores
Earnings Impact8/10
Growth Catalyst9/10
Governance Concern1/10
Regulatory Risk2/10
Balance Sheet Risk5/10
Liquidity Impact9/10
Market Sentiment8/10
✦ Ask a Question
Ask anything about this announcement — AI will answer based on the filing content.
Full Announcement
NTPC Limited has informed the Exchange about Investor Presentation
Attachments (1)
📄pdf
Download →
9425178051_27072026160924_4_Disclosure_for_Investor_Presentation_signed.pdf
View document text
Ref. No.:01/ FA/ISD/Compliance/2026-27 Dated: 27.07.2026
Listing Department Corporate Relationship Department,
National Stock Exchange of India Limited BSE Limited, Rotunda Building,
‘Exchange Plaza’, C-1, Block G, P J Towers, Dalal Street, Fort,
Mumbai - 400 001.
Bandra Kurla Complex, Bandra (E),
Mumbai - 400 051.
Scrip Code – 532555
Scrip Code - NTPC
Sub: Investor Presentation
In terms of Regulation 30 of SEBI (LODR) Regulations, 2015, we hereby submit the Investor Presentation
proposed to be made at the 22nd Annual Analysts and Institutional Investors Meet of NTPC Limited on 27th
July 2026. Copy of the presentation is also available on the company website and can be assessed through the
following link.
https://ntpc.co.in/investors/confrence-call-analyst-meet-investors/annual-analysts-institutional-investors-meet
Yours faithfully,
(Ajay Garg)
AGM (Finance)
Investor Relations Department
Analysts and
Institutional
Investors Meet
tr.rllafllll
Presentation Outline NTPC
Indian Economy Company Overview Ene1rgy Transition with
&Sectoral Outlook Accelerated Growth
01 03
New Frontiers Operational Excellence Financial Performance
04 05 06
Indian Economy &
Sectoral Outlook
tr.rllafllll
NTPC
Fastest Growing Maior Economy
1 llal l'ndia 6.4%
2 China 4.6% India GDP Growth
3 ~ Brazil 2.4%
2025 (Est) - 6.20/o
4 • United States 2.3%
2025 (Act) - 7.7°/o
5 Canada 1.1%
6 tl.Jnitedl Kingdom 1.0%
2026 (Est) - 6.4%
7 Germany 0.7%
2027 (Est) - 6.7%
8 France 0.6%
9 I Japan 0.6%
10 1taly ,0,5%
India leads all G7 members and BRICS peers on 2026 growth, projected at 6.4o/o - more than 1.4x China's 4.6°/o
and - 3x the 2.3°/o pace of the United States and Brazil, against a global growth backdrop ·Of 2.4%.
Source : IMF Wo rld Economic Outlook Update- July 26 and Apr 25
tr.rllafllll
NTPC
• Viksit Bharat @2047, Net Zero by 2070
Net Zero Scenario
India's GDP
I I I I
Non Fossil (Mix) 2026 2050 2070
I > >
2070
Capacity 98°/o
2047 ...-
~ 11111111111
2025 75 > >
Generation
78°/o 100°/o
30 -
4.2 Trillion
L.:.J
Trillion
Trillion Cumulative Power
Investment • Sector
by 2070 Share
tr.rllafllll
Indian Power Sector NTPC
Installed Capacity Rising at Record Pace, Led by Renewables
549GW 297 GW (incl 237 GW RE) 162 GW
Total installed capacity, June 2026 Non-Fossil Fuel Source Solar capacity, June 2026
+ 13% YoY (from 485 GW) +22% Yo Y (from 243 GW) +40% YoY (from 116 GW)
Total Installed Capacity Trend (GW) Non Fossil Capacity Mix, June 2026 (o/o)
• Solar
550 • Wind
500 • Bio-power &
297GW • Small Hydro
• Hydro
FY22 FY23 FY24 FY25 June 26 • Nuclear
Source: Data from Centro/ Electricity uthorlty & National Power Portal
tr.rllafllll
NTPC
Strong Growth in Power Consumption
Increasing Per capita Consumption
Proiected Electricity req1uirement & Peak Load
(kWh/Year) of India
- -----------------------------,
13,000
I ----------------------~
Projections* I
1,200 I Projections* I
10,000
6,400
3,900
1,460
13,000
World United FY 25 ' FY 50 FY70
8,100 average (20251 States (2025) I~ -----------------------~I
1,708
FY 26 FY 50 FY 70 :I India's per-capita electricity is roughly a third of the world
L------------------------------~
average and a tenth of the US level - pointing to substantial
(Bn units) Peak Demand (in GW)
structural demand growth ahead as incomes and
industrialization rise.
Both peak load demand and electricity requirement
are expected to rise at a healthy pace
•scenarios Towards Viksit Bharat and Net Zero: An Overview report by NIU Aoyog
cr.,lllflffl
NTPC
Company Overview
tr.rllafllll
NTPC
NTPC - Vision, Mission and Core Values
VISION MISSION
To be the world's Provide reliable power and energy transition solutions in
Leading Power Company, an economical, efficient and environment-friendly
accelerating India's Growth & Energy Transition manner, driven by innovation and agility
CORE VALUES
Integrity Customer Focus Mutual Respect Innovation & Total Quality &
& Agility & Trust Learning Safety
tr.rllafllll
NTPC at Glance NTPC
Largest Power • Operational capacity of over 90 GW • Consistent lead over All India in PLF
Operational
Generator in • - 24% share in electricity with - 17% Excellence • High Availability coupled with
India Efficiency
share in capacity
• Highest Group Profit of ~27,546
Accelerated Setting New crore in FY 26
• 9.6 GW added in FY26
Growth in Records
• Highest Group Capex of ~55,986
Capacity • 35.7 GW under construction crore in FY 26
• ESG Strategy - Clearly defined KPls
Consistent
Commitment • 12 GW of Operational RE Capacity & targets
Improvement in
on RE Front • Visible pipeline of -30GW • Consistently progressing on all
I ESG
• Target of 60GW (FY32) 136GW (FY37) defined KPls
tr.rllafllll
NTPC
Overview - Operation and Under Construction Capacity (GW)
~ ======;:=====;::==::::::;:::::::=====:------:----------
Under
Mode O·peration Portfolio Under Operation-90.9 GW Portfolio Capacity-126.61 MW
Construction
Cool 54.75 12.52 67.27 Wind Wind
5.74% Ga,
0.98%
Gas 5.14%
Gas 4.02 0.00 4.02 7.16%
Hydro 0.81 0.81 1.62
Hydro
Solar 1.42 0.07 1.48 4.13%
NTPC Standalone 60.99 13.40 74.39
Coal
Solar
Subsidiaries 74.10% 12.52%
Cool 3.92 0.80 4.72
Gas 2.49 0.00 2.49 Coal
65.62%
Hydro 2.95 2.77 5.72
PSP 1.00 0.00 1.00
Solar 7.17 8.96 16.13 Maintaining Energy Leadership
Wind 0.36 4.90 5.26
Share of Electricity Generated
NTPC (Subsidiaries) 17.89 17.43 35.32 Share of Installed Capacity
(as on 31 March, 2026) (during FY26)
Joint Ventures (JV)
Cool 8.69 2.40 11.09
Solar 2.79 1.00 3.79
Wind 0.53 1.47 2.01
NTPC (JV) 12.02 4.87 16.89
NTPC (JV & Subsidiaries) 29.91 22.31 52.22
NTPC Grand Total 90.90 35.70 126.61.. ...
tr.rllafllll
NTPC Group Coal Mining Profile NTPC
Capacity
Coal Block Status
(MMTPA)
Pakri-Barwadih 22 Operational since Jon' 17.
Dulongo 7 Operational since Sep' 1 8
CB Pakri Barwadih Talaipalli 25 Operational since Nov' 1 9
9 9 9
Kerandari Chatti-Bariotu (CB) 7 Operational since Sep'22
Amella9
Amelio (THDC) 6 Operational since Feb'23
THDC N Dadu9,9 Badam
9 Jhorkhand Kerandari 6 Operational since Apr'23
Madhya Prode,h
Banhardih
Bodom 3 Under development
Talaipalli
9 Bonhordih (PVUNL) 12 Under development
Dulanga
Chattlsgarh North Dhadu (East) 4 Under Development
Odisho Total 92
Transfer of Coal Mining Business to NTPC Mining Ltd completed on 01 '1 April 2026
Captive Coal Production (MMT)
48.7
45.9
35.6
Coal Production FY26
23.5
4 8 •6 6 MMT (lnc/ud/ngCoa/ production from mines under development) 14.2
tr.rllafllll
NTPC - Global Investment Proiects NTPC
...2 Bangladesh: BIFPCL (A 50:50 JV of NTPC and BPDB)
=C>: aCi)
O • 1320 MW Thermal Power Project is operational since 2022.(G2G framework)
• 2 x 660 MW coal-based project with USD 2 Bn investment BIFPCL 2x660 MW Thermal
Power Plant, Bangladesh
i Sri Lanka: TPCL (A 50:50 JV of NTPC and EGL)
=> ~ • 50 MW +70 MW Solar Power Project (G2G framework)
o • Expected Commissioning in FY28.
• Estimated Project Investment - USD 43 Mn in phase-I. 120 MW Solar Project
in Sri Lanka
Mauritius: NMEL (A Wholly Owned Subsidiary)
"'O C:
C: C:
=> .2 • 15 MW Floating Solar PV with 12/48 MWhr BESS
• Location : Tamarind Falll Reservoir, Mauritius
• Estimated Project Cost (with BESS): - USD 30 Mn
Tamarind Falls Reservoir,
Consultancy: Services covering gamut of Power Sector Mauritius
• PMC Contracts for 6.6 GW has been awarded to NTPC under International Solar Alliance (ISA)
solar pork assignment.
• Capacity building programmes had been conducted for >650 participants from 40 countries under
ISA.
tr.rlllflffl
NTPC
Energy Transition 'Nith
Accelerated Gro'Nth
tr.rllafllll
Building a Sustainable Future NTPC
Coal Mining
Renewables & Nuclear
Green H2
Solutions for EV
Power trading
Mobility
Energy
Waste to wealth CCU&
By-products
Consultancy International
Business
tr.rllafllll
NTPC
Portfolio Proiections
Installed Capacity (GW) Generation (BUs)
5 GW 14 BU
5% 3%
91 GW 432 BU
Jun-26 FY 26
19 BU
6GW 20 BU
4% 3%
150 GW 673 BU
2032 FY 32
1 GW 5 BU
11 GW 39 BU
4% 4%
136GW 250GW 943 BU
2037 54% FY 37
6GW 46 BU
3% So/o
Thermal Hydro Nuclear • Renewables • Thermal
[Showing first 8,000 characters — download PDF for full document]