BSEResult24 Jul 2026 · 24 Jul 2026, 02:23 pm
Please find enclosed the disclosure on unaudited financial results for the quarter ended 30th June, 2026.
CG Power and Industrial Solutions Ltd · 500093
✦ AI SummaryResults
CG Power and Industrial Solutions Ltd has announced its unaudited financial results for the quarter ended 30th June, 2026, and has also approved the establishment of a brownfield Switchgear & EPD Business manufacturing facility at Vilholi, Nashik, with an estimated project cost of Rs. 35.17 Crores.
Analysis Scores
Earnings Impact5/10
Growth Catalyst6/10
Governance Concern2/10
Regulatory Risk1/10
Balance Sheet Risk3/10
Liquidity Impact8/10
Market Sentiment5/10
✦ Ask a Question
Ask anything about this announcement — AI will answer based on the filing content.
Full Announcement
CG Power and Industrial Solutions Ltd - 500093 - Unaudited Financial Results For The Quarter Ended 30Th June, 2026
Attachments (1)
📄pdf
Download →
e3da703c-2552-4ce0-a37d-44e1f8e602cd.pdf
View document text
CG Power and Industrial Solutions Limited
Registered Office:
ONE UNITY CENTER, Unit Nos. 1504-1508,
Senapati Bapat Marg, Prabhadevi, Mumbai - 400013, India
T: +91 22 3120 7777 W: www.cqqlobal.com
Smart solutions.
Corporate Identity Number: L99999MH1937PLC002641
Strong relationships.
Our Ref: COSEC/057/2026-27 24th July, 2026
By portal
The Corporate Relationship Department The Assistant Manager - Listing
BSE Limited National Stock Exchange of India Ltd.
1st Floor, New Trading Ring Exchange Plaza, Bandra-Kurla
Rotunda Building, Complex, Sandra (East},
Phiroze Jeejeebhoy Towers, Mumbai 400 051
Dalal Street, Mumbai 400 001
Scrip Code : 500093 Scrip Id : CGPOWER
Dear Sir/ Madam,
Sub.: Outcome of Board Meeting under Regulation 30 of SEBI (Listing Obligations and
Disclosure Requirements) Regulations, 2015 ("SEBI Listing Regulations").
In accordance with Regulation 30 of the SEBI Listing Regulations thereto, we wish to inform
you that the Board of Directors of the Company has, at its meeting held today (Le. Friday,
24th July, 2026), inter-alia, considered and approved the following:
1. Unaudited Financial Results:
Unaudited Financial Results and Segment-Wise Financial Report of the Company, both
on standalone as well as consolidated basis, for the 1st quarter year ended 30th June 2026
("Financial Results") as recommended by the Audit Committee of the Company. A copy
of the Financial Results is enclosed for your information and records. We also enclose a
copy of the Limited Review Report on the Financial Results for the 1st quarter ended
30th June 2026, signed by M/s. S R B C & CO LLP, Chartered Accountants, Statutory
Auditors of the Company.
2. Establishment of a brownfield Switchgear & EPD Business manufacturing facility (GIS
division):
The existing EHV GIS manufacturing facility is operating at full capacity, with constraints
in both production throughput and available physical space. The shop floor, assembly
bays, testing areas, and material storage facilities are fully utilized. As a result, the plant
is unable to accommodate additional equipment or production lines without disrupting
ongoing operations. The current and projected order pipeline necessitates doubling of the
existing manufacturing capacity to meet higher order intake without compromising
delivery timelines and quality standards. The Board has approved the Brownfield
expansion project for manufacturing Extra High V e (EHV) Gas Insulated Switchgear
(GIS) at Vilholi, Nashik. ~~ndu5~ttie1 \~
if £) ~
(!) itC.
~-4000\'?>·*
CG Power and Industrial Solutions Limited
Registered Office:
ONE UNITY CENTER, Unit Nos. 1504-1508,
Senapati Bapat Marg, Prabhadevi, Mumbai - 400013, India
T: +91223120 7777 W: www.cqglobal.com
Smart solutions.
Corporate Identity Number: L99999MH 1937PLC002641
Strong relationships.
The total estimated project cost is approximately Rs. 35.17 Crores (net of taxes). The
project is expected to be completed within 4-6 months. The Company is in the process of
setting up the Greenfield Project. It is expected that 87% of the Brownfield Project assets
proposed to be transferred to the Greenfield facility upon its commissioning.
The requisite disclosure as required as per the requirements of Regulation 30 of the SEBI
Listing Regulations and SEBI Master Circular Ref. No. SEBI/HO/49/14/14(7)2025-CFD
POD2/l/3762/2026 dated ~0th January, 2026 is enclosed as Annexure I.
The meeting of the Board of Directors commenced at 11 :30 a.m. (1ST) and ooncluded at 02: 10
p.m. (1ST).
We would appreciate if you could take the same on record.
Thanking you,
Yours faithfully,
For CG Power and Industrial Solutions Limited
Sanjay Kumar Chowdhary
Company Secretary and Compliance Officer
Encl.: as above.
CG Power and Industrial Solutions Limited
Registered Office:
ONE UNITY CENTER, Unit Nos. 1504-1508,
Senapati Bapat Marg, Prabhadevi, Mumbai - 400013, India
T: +91 22 3120 7777 W: www.cgglobal.com
Smart solutions.
Corporate Identity Number: L99999MH1937PLC002641
Strong relationships.
Annexure I
Sr. Particulars Description
1. existing capacity; 228 Eq Units
2 existing capacity 91% (FY 26)
utilization;
3. proposed capacity 600 Eq Units (FY 30 - Peak capacity)
addition;
4. period within which the 4 - 6 months
proposed capacity is to be
added;
5. investment made/to be Rs. 35.17 Crores (net of taxes)
made;
6. mode of financing; Internal accruals/through equity
7. rationale The existing EHV GIS manufacturing facility is operating
at full capacity, with constraints in both production
throughput and available physical space. The shop floor,
assembly bays, testing areas, and material storage
facilities are fully utilized. As a result, the plant is unable
to accommodate additional equipment or production lines
without disrupting ongoing operations. The current and
projected order pipeline necessitates doubling of the
existing manufacturing capacity to meet higher order
intake without compromising delivery timelines and
quality standards.
SR BC& COLLP 12th Floor, The Ruby
29 Senapati Bapat Marg
Dadar ( West)
Chartered Accountants
Mumbai '400 028, India
Tel: +91 22 6819 8000
Independent Auditor's Review Report on the Quarterly Unaudited Standalone Financial Results of the
Company Pursuant to the Regulation 33 of the SEBI (Listing Obligations and Disclosure Requirements)
Regulations, 2015, as amended
Review Report to
The Board of Directors
CG Power and Industrial Solutions Limited
I. We have reviewed the accompanying statement of unaudited standalone financial results of CG Power
and Industrial Solutions Limited (the "Company") for the quarter ended June 30, 2026 attached herewith
(the "Statement"), being submitted by the Company pursuant to the requirements of Regulation 33 of the
SEBI (Listing Obligations and Disclosure Requirements) Regulations, 2015, as amended (the "Listing
Regulations").
2. The Company's Management is responsible for the preparation of the Statement in accordance with the
recognition and measurement principles laid down in Indian Accounting Standard 34 (Ind AS 34),
"Interim Financial Reporting", prescribed under Section 133 of the Companies Act, 2013 as amended,
read with relevant rules issued thereunder and other accounting principles generally accepted in [ndia
and in compliance with Regulation 33 of the Listing Regulations. The Statement has been approved by
the Company's Board of Directors. Our responsibility is to express a conclusion on the Statement based
on our review.
3. We conducted our review of the Statement in accordance with the Standard on Review Engagements
(SRE) 2410, "Review of Interim Financial Information Performed by the Independent Auditor of the
Entity" issued by the Institute of Chartered Accountants of India ("ICAI"). This standard requires that
we plan and perform the review to obtain moderate assurance as to whether the Statement is free of
material misstatement. A review of interim financial information consists of making inquiries, primarily
of persons responsible for financial and accounting matters, and applying analytical and other review
procedures. A review is substantially less in scope than an audit conducted in accordance with Standards
on Auditing issued by ICAI and consequently does not enable us to obtain assurance that we would
become aware of all significant matters that might be identified in an audit. Accordingly, we do not
express an audit opinion.
4. Based on our review conducted as above, nothing has come to our attention that causes us to believe that
the Statement, prepared in accordance with the recognition and measurement principles laid down in the
aforesaid Indian Accounting Standards ('Ind AS') specified under Section 133 of the Companies
Act, 2013 as amended, read with relevant rules issued thereunder and other accounting principles
generally accepted in India, has not disclosed the information required to be disclosed in terms of the
Listing Regulations, including the manner in which it is to be disclosed, or that it contains any material
m
[Showing first 8,000 characters — download PDF for full document]