Dated: 15-10-2026
BSE Limited (“BSE”) National Stock Exchange of India Limited (“NSE”)
Phiroze Jeejeebhoy Towers, Exchange Plaza, C-1, Block G,
Dalal Street, Bandra Kurla Complex, Bandra (East),
Mumbai – 400 001 Mumbai – 400 051
SCRIP CODE: 544951 SYMBOL: ARMEE
Subject: Intimation under Regulation 30 of SEBI (Listing Obligations and Disclosure
Requirements) Regulations, 2015 (“SEBI Listing Regulations”) – regarding non-execution of the
Bondada EPC Project forming part of the order book disclosed in the Red Herring Prospectus
Dear Sir/ Madam,
Pursuant to Regulation 30 read with Item 4 of Para B of Part A of Schedule III of the Securities and
Exchange Board of India (Listing Obligations and Disclosure Requirements) Regulations, 2015
(“Listing Regulations”) and the SEBI Master Circular No. HO/49/14/14(7)2025-CFD-
POD2/I/3762/2026 dated January 30, 2026, we wish to inform you of the termination / non-execution
of the Bondada EPC Project awarded by Bondada Engineering Limited (“BEL” or “Awarding
Entity”), which formed part of the Company’s order book disclosed in its Red Herring Prospectus
dated 16 September 2026 and Prospectus dated 28 September 2026 (“Offer Documents”).
The Company had initially accepted the Letters of Award (LOAs) dated June 26, 2026 issued by BEL
for the said project. Subsequently, there was a substantial escalation in raw material costs, materially
affecting the commercial viability of the project under the originally agreed terms.
The Company had communicated these cost escalations to BEL through various correspondences and
sought appropriate revisions to the commercial terms.
In view of the continued cost escalation and the resulting commercial constraints, the Company has
communicated its inability to proceed with the project under the existing terms.
The decision has been taken after careful commercial evaluation, keeping in view financial prudence,
project viability and protection of stakeholders’ interests.
The Company remains committed to maintaining financial discipline and pursuing sustainable,
commercially viable business opportunities.
The financial implications and consequential adjustments to the Company’s outstanding order book, as
applicable, shall be appropriately reflected in its subsequent disclosures. The details required under the
aforesaid Master Circular are enclosed as Annexure-A to this letter
This intimation is also being made available on the website of the Company at
https://armeeinfotech.com/investors/ in terms of Regulation 30(8) and Regulation 46 of the Listing
Regulations.
Request you to kindly take this on your record
Thank You,
For ArMee Infotech Limited
Purnima Jain
Company Secretary & Compliance Officer
Membership No. -A34071
Annexure-A
Details as required under Regulation 30 of the Listing Regulations read with SEBI Master
Circular No. HO/49/14/14(7)2025-CFD-POD2/I/3762/2026 date January 30, 2026
Sr. Particulars Details
1. name of parties to the Bondada Engineering Limited (“BEL”), as the awarding entity, and
order(s)/contract(s); ArMee Infotech Limited (“the Company”), as the contractor.
The End Client of the project is NTPC Renewable Energy Limited,
which had awarded the main contract to BEL; the orders awarded to
the Company were on a back-to-back basis with the said main
contract.
2. nature of the Domestic orders for the Amended EPC Balance of System (BOS)
order(s)/contract(s); Packages, comprising Supply, Services (inland transportation and
transit insurance, installation, civil and allied works and safety
compliance) and Operation & Maintenance (three years paid O&M
including AMC of specified equipment), for Block-1 (300 MW AC)
and Block-3 (300 MW AC) of the Grid Connected Solar PV Project
of NTPC Renewable Energy Limited at Fatehgarh, Rajasthan.
Aggregate order value of Rs. 7,40,97,14,623/- (inclusive of GST),
i.e. Rs. 3,75,17,83,052/- for Block-1 and Rs. 3,65,79,31,571/- for
Block-3.
3. date of execution of Letters of Award bearing No. BEL/LOA/26-27/20 (Block-1) and No.
the BEL/LOA/26-27/21 (Block-3), each issued separately for the
order(s)/contract(s) Supply, Services and O&M packages, all dated June 26, 2026, issued
by BEL and accepted by the Company, with reference to the
Amended EPC BOS Contract dated June 29, 2026.
4. details of amendment Reasons: Subsequent to acceptance of the LOAs, there was a
or reasons for substantial escalation in raw material costs. As the contract price
terminations and under the LOAs was firm and fixed with no price escalation payable,
impact thereof (to the the project became commercially unviable under the originally
extent possible); agreed terms. The Company had communicated the cost escalation
to BEL and sought revision of the commercial terms; however, in the
absence of such revision, the Company has communicated its
inability to proceed with the project under the existing terms.
Impact: The outstanding order book of the Company shall stand
reduced by the aforesaid order value of Rs. 7,40,97,14,623/-
Sr. Particulars Details
(inclusive of GST). Other financial implications, if any, shall be
appropriately disclosed by the Company in its subsequent
disclosures.