NSECopy of Newspaper Publication23 Jul 2026 · 23 Jul 2026, 04:00 pm
Copy of Newspaper Publication
Asian Hotels (North) Limited · ASIANHOTNR
✦ AI Summary
Asian Hotels (North) Limited has informed the Exchange about Copy of Newspaper Publication regarding Special Window for re-lodgement of transfer request of physical shares dated 23.07.2026
Analysis Scores
Earnings Impact1/10
Growth Catalyst1/10
Governance Concern1/10
Regulatory Risk1/10
Balance Sheet Risk1/10
Liquidity Impact1/10
Market Sentiment5/10
✦ Ask a Question
Ask anything about this announcement — AI will answer based on the filing content.
Full Announcement
Asian Hotels (North) Limited has informed the Exchange about Copy of Newspaper Publication regarding Special Window for re-lodgement of transfer request of physical shares dated 23.07.2026
Attachments (1)
📄pdf
Download →
ASIANHOTNR_23072026155945_SubmissionofNewspaparadvertisement23072026.pdf
View document text
REGISTERED OFFICE :
BHIKAIJ] CAMA PLACE, M.G. MARG,
NEW DELHI - 110066
TELEPHONE : 26791234
FAX : 26791033
CIN : L55101DL1980PLCO1 1037 ASIAN HOTELS
Website : www.asianhotelsnorth.com
E-mail : investorrelations@ahinorth.com
APANS IAN HOTELS (NORTH) LIMITED
AHNL/CS/1013/2026
July 23, 2026
Corporate Services Department Listing Department
BSE Ltd. National Stock Exchange of India Ltd.
Phiroze Jeejecbhoy Towers Exchange Plaza, 5" Floor
Dalal Street Plot No. C/1, G Block
Mumbai- 400 001 Bandra-Kurla Complex, Bandra (E)
Mumbai — 400 051
Scrip Code/Scrip ID: 500023/ASIANHOTNR Symbol: AS ANHOTNR
Sub: Submission of the copies of Newspaper publication regarding opening of special window
for re-lodgement of transfer request for physical shares
Dear Sirs,
Pursuant to Regulation 30 and 47 of the Securities and Exchange Board of India (Listing Obligations and
Disclosure Requirements) Regulations, 2015, please find attached herewith copies of the Newspaper
Advertisement published in each of Business Standard (English daily) and Business Standard (Hindi daily) both
dated July 23, 2026 with regard to opening of special window to eligible shareholders for re-lodgement of
transfer request of physical shares in accordance with SEBI circular No. SEBI/HO/38/13/11(2)2026-MIRSD-
POD/1/3750/2026 dated January 30, 2026.
You are requested to take the same on record.
Thanking You,
Yours faithfully,
For Asian Hotels (North) Limited
Kniti Narula Sehgal
Company Secretary & Compliance Officer
Membership No. A 18422
Encl: as above
HYATT
OWNERS OF:
REGENCY
DELHI
TAKE TWO 23
Business Standard new ven | THURSDAY, 23 JULY 2026
SUDHEER PAL SINGH tioned that India’s module Indian manufacturers to
New Delhi, 22 July Solar power clouds manufacturing base has increasingly compete on a
expanded to nearly four times global scale, accordingto Rubix
Even as India’s solar power the annual demand, while Data Sciences.
sector has expanded aggres- BloombergNFF estimates that CSEP’s Rao says the overca-
sively over the past few years, manufacturing capacity has pacity concern is real, but is
two key factors could hinder its increased nearly 13-fold since concentrated more in module
growth: Rising regional dispar- 2020 against only a tripling of assembly, where capacity has
ity and consolidation in the domestic demand, creating a expanded much faster than
domestic solar equipment Regional concentration in installations and manufacturing overcapacity supply glut. domestic demand. “This could
manufacturing space. “The emerging oversupply lower utilisation, compress
India currently has 157 Giga- are emerging as the sector’s biggest structural challenges is beginning to reshape indus- margins and trigger consolida-
watt (Gw) of installed gener- try dynamics and competitive tion, but it need not deraillong-
ation capacity in solar power, positioning. Capacity utilisa- term solar growth if demand
which has grown exponentially tion at module assembly plants continues to scale. The deeper
from a paltry 2.8 Gw in 2014, has reportedly fallen to around strategic issue is upstream:
thanks to improvements in 40 per cent, compared to over domestic cell, wafer and poly-
technology and a supportive 7O per cent during 2022-23, silicon capacity is still inad-
policy environment. In fact, when export demand from the equate, and with ALMM for
2025-26 was a watershed year US remained strong,” he said. cells from 1 June 2026 and acur-
for India’s solar growth, record- As = manufac- rent DCR and non-
ing the highest-ever annual turerscompeteinan ~~~ DCR module price
solar addition of 44.61 Gw, increasingly THE SECTOR IS differential of
exceeding a target of 34 Gw and crowded market, NOW ENTERING roughly = 7-10 per
nearly twice the previous companies are being A PHASE OF Watt Peak, policy
record of 23.83 Gwin 2024-25. forced to recalibrate CONSOLIDATION, must carefully bal-
The sector is now entering a strategies, improve MOVING AWAY ance domestic
phase ofconsolidation, moving operational _ effi- FROM CAPACITY manufacturisunpg-
away from capacity expansion ciency, and diversify EXPANSION port with affordable
towards systemic reforms, into export oppor- TOWARDS solar deployment.”
including grid integration, dis- tunities, he said. SYSTEMIC he said.
patchable clean energy archi- “Technology REFORMS Dwivedi argues
tecture, and market reforms. transition is also ~ that the surge in
becoming a major India’s domestic
Regional disparities challenge, with nearly 30 Gw of module manufacturing capac-
While Indiais poisedtobecome existing capacity still depend- ity needs to be seen in light of
the world’s second-largestsolar ent on MonoPERC technology, the fact that these are not very
market in 2026 in terms of which is rapidly being replaced capital-intensive setups and
annualinstallations, geograph- by more efficient next-gener- that such investment decisions
ical diversification remains a ation technologies such as are driven by market factors.
key challenge, with seven TOPCon,” Jambhale added. “Indiias emerging as one ofthe
states accounting for nearly If the current supply glut leading solar power equipment
85 per cent ofthe total installed persists over the next few years, manufacturing destinations
solar capacity. “Regional concentration is open-access solar, feeder solar- representatives say investor Manufacturing glut hewarned, the sectoris likely to and consequently a significant
Rajasthan and Gujarat have partly structural, as utility-scale isation and solar pumps to interest follows stronger project The other issue in India’s solar witness increased consolida- portion of the manufacturing
Solar trends
held the first and the second solar follows irradiation, con- complement large solar parks, economics. According to Amit success story lies on the tion, with technologically capacity is eventually going to
ranks, respectively, in capacity tiguous land availability, ease of he added. = India’s installed solar Manohar, secretary general, domestic manufacturing front, advanced and vertically inte- serve export demand. Occa-
addition for adecade. land access, and evacuation Anujesh Dwivedi, partner at power capacity has Indian Solar Manufacturers which is seeing consolidation grated players better positioned sional mismatbectwheene tshe
Maharashtra and Karnataka readiness. Therefore, the Deloitte India, agreed that grown to 157 Gw from Association (Isma), India’s solar amid increasing overcapacity tosurvive pricing pressures and supply and demand side are
have also shown strong upward answer is not to force projects regional disparity is borne of a 2.8 Gw in 2014, witha capacity has clustered in a that threatens a supply glut. sustain competitiveness, while part and parcel of a market
movement in rankings. into weaker locations, but to combination of availability of record 44.61 Gw added few states because of superior Solar capacity has expanded manufacturers operating on driven system,” he said.
However, many large states create better locational signals cheap land and solar irradi- in 2025-26 resource availability, lower at a blistering pace, driven by older technologies may face In the long run, experts
like Tamil Nadu, Andhra Pra- through state-specific tenders, ation — the amount of solar land costs, and stronger project strong policy support, import margin compression and believe policy measures such as
desh, and Madhya Pradesh solar parks in under-repre- energy received by a specific m just seven states economics. substitution efforts, and rising capacity rationalisation. the production-linked incen-
account for 85 per cent
have fallen in both rank and sented states, faster trans- surface area over astated period “Rajasthan and Gujarat renewable energy ambitions. However, the problem is not tive scheme for module manu-
of the installed capacity
share despite early leadership mission planning, and more of time — and is also mostly have emerged as leaders due to The country added 119 Gw of limited to modules alone. Pho- fa
[Showing first 8,000 characters — download PDF for full document]