NSEBagging/Receiving of orders/contracts8 Oct 2026 · 8 Oct 2026, 07:11 pm
Bagging/Receiving of orders/contracts
Waaree Renewable Technologies Limited · WAAREERTL
✦ AI Summary▲ PositiveOrder Win
Waaree Renewable Technologies Limited has received a Letter of Acceptance from a Public Sector Undertaking (PSU) for a 5 MWp Turnkey Solar PV Project, including comprehensive Operation & Maintenance for 10 years.
Analysis Scores
Earnings Impact8/10
Growth Catalyst9/10
Governance Concern1/10
Regulatory Risk1/10
Balance Sheet Risk2/10
Liquidity Impact9/10
Market Sentiment9/10
✦ Ask a Question
Ask anything about this announcement — AI will answer based on the filing content.
Full Announcement
Waaree Renewable Technologies Limited has informed the Exchange about Bagging/Receiving of orders/contracts
Attachments (1)
📄pdf
Download →
WAAREERTL_08102026191118_Intimation-s.pdf
View document text
Execution with Pace & Comfort
October 8, 2026
To, To,
The Manager The Manager
BSE Limited, National Stock Exchange of India Limited
Phiroze Jeejeebhoy Towers, Exchange Plaza, C-1, Block G,
Dalal Street, Fort, Bandra – Kurla Complex, Bandra (East)
Mumbai – 400 001 Mumbai – 400 051
Scrip Code: 534618 Scrip Symbol: WAAREERTL
Ref.: Disclosure under Regulation 30 of the SEBI (Listing Obligations and Disclosure Requirements)
Regulations, 2015
Sub.: Intimation of receipt Letter of Acceptance from PSU for 5 MWp Trunkey Solar PV Project
Dear Sir / Ma’am,
With reference to the captioned subject and pursuant to Regulation 30 of the SEBI (Listing Obligations and
Disclosure Requirements) Regulations, 2015, we wish to inform you that Waaree Renewable Technologies
Limited (“the Company”) has received a Letter of Acceptance (LOA) from Public Sector Undertaking (PSU) for
Turnkey Engineering, Procurement & Commissiong (EPC) work of a 5 MWp Grid-connected Solar PV Project,
along with comprehensive Operation & Maintenance for a period of 10 years.
The details are required under Regulation 30 of the Listing Regulations read with SEBI Circular No.
HO/49/14/14(7)2025-CFD-POD2/I/3762/2026 dated January 30, 2026 is enclosed herewith as “Annexure A”.
The Company received intimation / the Letter(s) of Award on October 8, 2026, at 04:27 pm (IST).
We request you to take the above on record and acknowledge receipt of the same.
Thanking you,
Yours faithfully,
For Waaree Renewable Technologies Limited
Heema Shah
Company Secretory & Compliance Officer
Email Id: info@waareertl.com
Waaree Renewable Technologies Limited
(A subsidiary of Waaree Energies Limited)
504, Western Edge-1, Off. Western Express Highway, Tel.: +91 22 6644 4444 CIN : L93000MH1999PLC120470
Borivali (E), Mumbai 400 066. Maharashtra INDIA E : info@waareertl.com GST: 27AADCS 1824J2ZB
W : www.waareertl.com
Execution with Pace & Comfort
Annexure A
Disclosure under Regulation 30 of the SEBI (Listing Obligations and Disclosure Requirements) Regulations,
2015 read along with SEBI Circular No. HO/49/14/14(7)2025-CFD-POD2/I/3762/2026 dated January 30,
2026
Sr. Particulars Details
1 Name of the entity awarding the order(s) /
Public Sector Undertaking (PSU)
contract(s) / Letter of Award (LOA)
2 Significant terms and conditions of order(s) / The Company has received Letter of Acceptance of
contract(s) / Letter of Award (LOA) awarded in Turnkey Engineering, Procurement and Construction
brief (EPC) work of 5 MWp Grid-connected Solar PV Project
along with Operation & maintenance of 10 years.
3 Whether order(s) / contract(s) have been Domestic Entity
awarded by domestic / international entity
4 Nature of order(s) / contract(s) Commercial Order
5 Whether domestic or international Domestic
6 Time period by which the order(s) / contract(s) is The Turnkey EPC Project is to be completed within 12
to be executed months from the date of issue of the LOA, followed by
Operation & Maintenance for a period of 10 years, as
per the terms of the LOA.
7 Broad consideration or size of the order(s) / The Order Size is 5 MWp
contract(s)
8 Whether the promoter / promoter group / group No
companies have any interest in the entity that
awarded the order(s) / contract(s)? If yes, nature
of interest and details thereof
9 Whether the order(s) / contract(s) would fall No
within related party transactions? If yes,
whether the same is done at "arm’s length"
Waaree Renewable Technologies Limited
(A subsidiary of Waaree Energies Limited)
504, Western Edge-1, Off. Western Express Highway, Tel.: +91 22 6644 4444 CIN : L93000MH1999PLC120470
Borivali (E), Mumbai 400 066. Maharashtra INDIA E : info@waareertl.com GST: 27AADCS 1824J2ZB
W : www.waareertl.com