NSEAddendum29 Jun 2026 · 29 Jun 2026, 02:41 am
Addendum
Standard Engineering Technology Limited · SETL
✦ AI SummaryM&A
Standard Engineering Technology Limited has informed the Exchange about an Addendum to the Investors Presentation dated June 25, 2026 in relation to the Proposed Acquisition of GScale Energy Private Limited. The Addendum provides further information on the strategic rationale, funding framework, operational roadmap, products manufactured by GScale, and long-term growth opportunities associated with the proposed transaction.
Analysis Scores
Earnings Impact5/10
Growth Catalyst8/10
Governance Concern2/10
Regulatory Risk3/10
Balance Sheet Risk4/10
Liquidity Impact6/10
Market Sentiment5/10
✦ Ask a Question
Ask anything about this announcement — AI will answer based on the filing content.
Full Announcement
Standard Engineering Technology Limited has informed the Exchange about Addendum to the Investors Presentation dated June 25, 2026 in relation to the Proposed Acquisition of GScale Energy Private Limited
Attachments (1)
📄pdf
Download →
SGLTPL_29062026024107_Addendum_to_investors_presentation-29062026.pdf
View document text
Date: June 29, 2026
To, Listing Compliance Department
Listing Compliance Department National Stock Exchange of India Limited
BSE Limited Exchange Plaza, C-1 Block G,
Phiroze Jeejeebhoy Towers Bandra - Kurla Complex, Bandra (East)
Dalal Street, Mumbai - 400 051
Mumbai - 400 001
SCRIP CODE: 544333 SYMBOL: SETL
Dear Sir/Madam,
Sub: Addendum to the Investors Presentation dated June 25, 2026 in relation to the Proposed Acquisition
of GScale Energy Private Limited
Pursuant to Regulation 30 read with Schedule III of the SEBI (Listing Obligations and Disclosure Requirements)
Regulations, 2015, as amended, and further to our disclosure dated June 25, 2026 regarding the proposed
acquisition of up to 51% equity stake in GScale Energy Private Limited (“GScale”) by Standard Engineering
Technology Limited (“the Company”), we wish to inform you that the Company is issuing an Addendum to the
Investors Presentation providing further information on the strategic rationale, funding framework, operational
roadmap, products manufactured by GScale and long-term growth opportunities associated with the proposed
transaction.
The enclosed Addendum to the Investors Presentation is intended to provide shareholders, investors, analysts and
other stakeholders with supplementary information regarding the Company's strategic entry into the AI
Datacenter Infrastructure sector through GScale Energy Private Limited.
A copy of the Addendum to the Investors Presentation is enclosed herewith for your information and record.
You are requested to kindly take the above information on record.
Thanking you,
Yours faithfully,
For STANDARD ENGINEERING TECHNOLOGY LIMITED
(Formerly known as Standard Glass Lining Technology Limited)
Kallam Hima Priya
Company Secretary & Compliance Officer
Encl: A/a
Standard Engineering Technology Limited
(Formerly known as Standard Glass Lining Technology Limited)
Registered Office: D-12, Phase -I, IDA Jeedimetla, Hyderabad-500055
Corporate Office: 10th Floor, PNR High Nest, Hydernagar, KPHB Colony, Hyderabad-500085
Manufacturing Unit: Survey No. 42/A, Alinagar, Chetlapotharam Village, Gaddapotharam,
SangaReddy-502319
CIN: L29220TG2012PLC082904 Email: corporate@standardengtech.com Website: www.standardengtech.com Tel: + 040 3518 2204
A STRAT EG I C PAR TN ERSH I P
Building what powers the AI revolution
Standard Engineering is joining hands with GScale Energy to design and manufacture the power and
cooling equipment behind India's AI Datacenters.
Investor & Industry Briefing June 2026
Images used are for representation only; copyright owned by respective owners.
T H E AI IN F R AST R U C T U R E SU PER C YC L E
$5 trillion+
will be spent building the Datacenters behind AI by 2030.
Every one of them depends on two things — power and cooling. That is exactly what SETL and Gscale Energy will manufacture, in
India, at giga-watt scale.
Source: McKinsey & Company, ‘The cost of compute: a $7 trillion race to scale Datacenters’, 2025.
WHY THIS MATTERS NOW
India sits at the heart of a $5 trillion build-out
The capital flowing into AI Datacenters is staggering — and every facility needs power and cooling equipment.
Most of it is still imported today or needs long lead time to supply. We intend to change that.
$5 trillion+ INDIA DATACENTER CAPACITY (GW)
Global spend on AI Datacenters by 2030
10.5 GW
$60 billion
To be invested in India's AI Datacenters by 2030
growth
1.3 GW in 5 yrs
Power + Cooling = 50 - 60%
Investment
2025 2030E
$36 Billion is estimated to be invested in cooling and
* Source: Morgan Stanley
power infrastructure in India by 2030
GScale Energy designs & builds the same power and cooling infrastructure that is needed by India’s AI Datacenters
LET’S START WITH A SIMPLE QUESTION
Where does AI actually live?
AI doesn't live in “the cloud.” It runs on millions of power-
hungry chips inside real, physical Datacenter buildings.
AI is exploding
Every model is trained and run on clusters of GPUs — and the world
needs far more of them every month.
These chips run hot
An AI rack can draw 10–250 KW power compare to an ordinary
server running at less than 2 KW — and turns almost all of it into
heat.
So the limit is physical
Inside a modern AI Datacenter
The real bottleneck on AI isn't software. It's delivering power and
removing heat (cooling), at massive scale.
Datacenters are the factories of the AI age — power & cooling are their
foundation.
THE INVESTMENT CASE
A rare combination of size, timing and capability
Four things rarely come together at once. Here, they do.
01 02
A giant, early-stage market A proven operator at the helm
A $40–50 bn India build-out, at the very start of a decade-long AI 486 MW already delivered and 1 GW+ under execution, led by a 25-
infrastructure supercycle. year Datacenter veteran.
03 04
A full-stack, in-region moat Capital-light, self-funded
The made-in-India platform that manufactures power and cooling and ₹487 Cr funded entirely from SETL's own cash — no new debt, fast
builds the facility — under one roof. revenue.
THE STRATEGIC RATIONALE
Why SETL invested in Gscale Energy?
India's AI build-out has a bottleneck: most of the power and cooling equipment is imported — slow, costly and hard to scale. SETL saw
both a problem worth solving and a market worth leading.
A huge adjacent market Instant domain leadership
AI Datacenters need exactly the kind of precision, mission-critical Gscale Energy brings 25+ years of Datacenter DNA, 486 MW delivered
engineering SETL has mastered for over a decade. and the operator relationships that take years to earn.
A perfect capability fit Solving a national gap
SETL's manufacturing muscle + Gscale Energy's design and customer Replacing imports with made-in-India power and cooling — faster
access = a complete, full-stack platform. delivery, lower cost, strategic self-reliance.
MEET THE BUILDER
Standard Engineering: proven, trusted, profitable
For over a decade, SETL has designed and built complex, mission-critical plants for India's pharmaceutical and chemical industries —
where safety and reliability are everything. It already does the hard part: engineering critical infrastructure that simply cannot fail.
13 years ₹793 Cr 170+ 1.2M sq ft
Building engineering plants since 2013 Revenue in FY2026, profitably grown Products across critical industries Manufacturing & engineering space
Financially strong: ~₹220 Cr cash, CRISIL A/Positive rated — funding this entirely from its own resources.
A PROVEN MAKE-IN-INDIA PLAYBOOK
Japanese technology, made in India, supplied to the world
SETL has already done what Gscale Energy now sets out to do — bring world-class technology to India,
manufacture it locally, and supply it globally.
Strategic tie-up with AGI (Asahi Glassplant) & GL HAKKO —a 75-year glass-engineering legacy. AGI invested
Deep Japanese partnership
~₹200 Cr and is SETL's second-largest shareholder.
A 20-year exclusive licence to manufacture glass-lined equipment that India previously imported 100% —
World-firsts, made in India
genuine import substitution.
Now supplying the world
The same partnership opens SETL's entry into Japan and global markets through private-label and co-branding.
The same playbook for Gscale
Localise advanced technology, manufacture at scale, export with confidence —now applied to AI Datacenter
Energy
equipment.
Sources: AGI Japan / GL HAKKO partnership announcements; company disclosures (2023–2025).
MEET THE EXPERT
Two decades of Datacenter DNA — and the right
moment to enter
Gscale Energy is led by Mr. Brahma Reddy Kasu — a 25-year veteran who
helped build India's Datacenter industry and was President of CtrlS, one of
India's largest operators. The team enters manufacturing exactly as India's AI
build-out accelerates — with the expertise, capacity and relationships to lead
25+ years in critical infrastructure
A pioneer who helped shape India's modern Datacenter industry; former President of CtrlS.
486 MW delivered, 1 GW+ underway
Led Tier-IV Datacenter delivery at an unpr
[Showing first 8,000 characters — download PDF for full document]