NSEInvestor Presentation28 Sept 2026 · 28 Sept 2026, 10:45 pm
Investor Presentation
Power Mech Projects Limited · POWERMECH
✦ AI Summary
Power Mech Projects Limited has informed the Exchange about Investor Presentation, which will be shared and discussed with analysts and institutional investors during the upcoming Non-Deal Roadshow (NDRS) scheduled to be held tomorrow at Mumbai.
Analysis Scores
Earnings Impact5/10
Growth Catalyst6/10
Governance Concern2/10
Regulatory Risk1/10
Balance Sheet Risk3/10
Liquidity Impact8/10
Market Sentiment5/10
✦ Ask a Question
Ask anything about this announcement — AI will answer based on the filing content.
Full Announcement
Power Mech Projects Limited has informed the Exchange about Investor Presentation
Attachments (1)
📄pdf
Download →
POWERMECH_28092026224526_CL.pdf
View document text
Date: September 28, 2026
To To
Listing Department Dept. of Corp. Services
National Stock Exchange of India Limited BSE Limited
Exchange Plaza, C-1, Block G, Phiroze Jeejeebhoy Towers
Bandra Kurla Complex, Dalal Street
Bandra (E), Mumbai – 400 051 Mumbai- 400001
Symbol/Security ID: POWERMECH Security Code: 539302
Dear Sir/Madam,
Sub: Investor Presentation
*****
Pursuant to Regulation 30 read with Part A of Schedule III of the SEBI (Listing Obligations and Disclosure
Requirements) Regulations, 2015, please find enclosed herewith a copy of the Investor Presentation.
This presentation will be shared and discussed with analysts and institutional investors during the
upcoming Non-Deal Roadshow (NDRS) scheduled to be held tomorrow at Mumbai.
The same is also made available on the website of the Company:
https://powermechprojects.com/investor-presenations/
Kindly take the same on record and acknowledge the receipt of the same.
Yours faithfully,
For Power Mech Projects Limited
M. Raghavendra Prasad
Company Secretary and Compliance officer
Encl: as above
Growth UnlimitedPOWER MECH
Power Mech Projects Limited
Investor Presentation
September 2026
Strong execution, strong visibility, disciplined capital allocation
to build long-term shareholder value.
I. PMPL at a glance
Power Mech: A leading at-scale industrial and infra services provider
Execution Expertise: End to end project delivery across multi-sectors
Executing complex projects across power, rail and metro, roads, water and mining sectors, backed by 27
years of construction expertise and robust project management.
Scale and Leadership: One of Asia’s market leaders in Power O&M services
Managing 42+ GW of power-plant O&M globally (and approx. one fifth of India’s thermal base), enabled
by standardized processes, a dedicated technical cell equipped with digital tools to enable remote
upkeep and improve reliability.
Global Footprint: Proven execution capabilities and Expanding presence
Contributed ~9.8 GW to international grids and currently managing ~6.3 GW of O&M across MENA and
West Africa, positioning Power Mech as a trusted overseas execution partner and expanding
international revenue streams across nations.
Disciplined Financials: Sustained revenue momentum and profitability
Revenue grew ~3.2x over five years (17%+ CAGR) alongside a 67 b.p.s expansion(11.62% → 12.29%) in
EBITDA margins over the last 5 years. The ₹17,317 Cr order book (excl. MDO) covers 2.5+ years of
revenue, with further margin expansion expected via capital discipline and profitable growth in MDO and
O&M segments.
Multi segment presence backed by strong technical execution
Mining,
Industrial Infrastructure
Industrial Services2 Development and
Construction1 Construction
Operations
Execute full-scope EPC of BOP Provide comprehensive O&M - Deliver civil/structural construction Develop mine infrastructure,
systems and erection, testing and mechanical, electrical and C&I for power, industrial and urban mineral processing operations and
commissioning of BTG systems services including control- infrastructure – foundations, decks, manage full contract mining
(including FGD/ SCR) across room/desk operations, cooling towers, CHPs, roads and leveraging PMPL’s execution and
power, nuclear, oil-&-gas, boiler/turbine/auxiliary overhauls, coal‐handling plants O&M strengths
petrochemicals, steel and long-term AMCs for utility and
minerals captive plants
>80.3 GW >42 GW >33.47 Lakhs m3 9 Mn MT/ annum
Capacity added to grid Capacity under O&M Care globally Concreting works executed Peak rated mining capacity
>31.22 Lakhs MT >24,000 Manpower >756 TKM >39,500 Crs
Erection works completed Dedicated O&M manpower Overhead electrification executed Long-term contract value
>2.71 Lakhs MT Technical Cell 11.8 lakh inch mts >25 years
Structural fabrication completed live troubleshooting & PM Of piping at single project - Nigeria Multi-decade contract tenure
1 EPC of BOP systems and Erection, Testing and Commissioning (ETC) of BTG/BOP systems
2 Operations and Maintenance
Clients
Domestic International
Asia Gulf Power Service
Company Limited
Board of Directors
J P Chalasani (IndependentDirector)
Sajja Kishore Babu (Founder, CMD) • 40+ years experience in the Indian infrastructure industry
• 37+ years experience in Power and Infrastructure sector • He is a member of the Group Executive Council at Suzlon
• Serves on Board of subsidiary and joint venture companies Energy
• Holds a Bachelor degree in Mechanical Engineering • Previous associations include NTPC, Reliance Power, Punj
Lloyd and others
SajjaRohit (Executive Director)
B Prasada Rao (IndependentDirector)
• Leads Overseas Operations, Business Development,
• 37+ years experience at BHEL, including over 6 years as
Corporate Strategy and digital initiatives for Power Mech
Chairman & MD & holds directorship in 5 companies
group of companies
• He is also a member of 2 committees constituted by
• MBA from University of Oxford & Master’s Engineering
Government of India
Management degree from USC
Vasundhara Sinha (Independent Director)
M Rajiv Kumar (Non-Executive Director)
• 38+ years experience in BHEL • A distinguished 1988-batch officer of the Indian Revenue
• Rose to the level of Executive Director, Power Sector, Eastern Service (IRS) who retired as Principal Chief Commissioner -
Income Tax.
Region
• Mr. Kumar is a graduate in Electrical Engineering from the • She was the Additional Director General of Foreign Trade under
the Ministry of Commerce, Government of India, in New Delhi
BIT, Sindri
Audit Committee CSR Committee Nomination and Remuneration Committee Risk Management Committee Stakeholder Relationship Committee Executive Committee
Leadership Team
G Srinivasulu
N Nani Aravind M Raghavendra Prasad S.K. Kodandaramaiah
Executive Director (Non-Board)
Group Chief Financial Officer Group Company Secretary & Director (Non-Board) Head – Facility Engineering
Compliance Officer Business Development Services & Stores
L Sai Shankar Srinivasan Selvaraj N Srinivasa Rao
D.S.G.S. Srinivas Babji
Executive Director (Non-Board) Executive Director (Non-Board) Director (Non-Board)
Executive Director (Non-Board) – O&M
Head – Engineering Head – Industrial EPC Head – Gas Power
Head - O&M 1
T Srinivasa Prasad
K Sekhar Babu M Ramesh Abdul Basheer
Senior Vice President – Civil Infra
Sr. Vice President – O&M Head – Civil Infra Vice President – Civil Infra Vice President – Industrial Construction
Head - O&M 2 Head – Civil Infra Subcontracts Head – Industrial Construction
R Murali Krishna
Uppada Subbarao Anand Vishwanath P Dileep Kumar
Vice President – Industrial
Construction Vice President Bhushan Senior General Manager
Head – Commercial Subcontracts
Head – HR & Admin
Vice President – Mobility
Head – UAE Operations
Head - Operations
K Sai Krishna Prasad
T Ramesh K Suresh Babu
Whole-Time Director – PM Green
Whole-Time Director – KTMPL Whole-Time Director - KBP Mining
Pvt. Limited
Head - Operations Head - Operations
II. Industry Dynamics
Building on a strong multi-sector foundation to convert industry tailwinds
into scalable, profitable growth
Segment Industry Tailwinds Positioning & Strategy
• 84 GW of boiler, turbine, generator and BOP erected to
• CEA's generation adequacy plan takes coal capacity from 231 GW to 291 GW by FY32 — ~60 GW
date, up to 800 MW unit size.
Industrial of new build and the mechanical erection scope that comes with it.
• Singareni ₹2,550 Cr BOP EPC sets the 800 MW turnkey
Construction1
• Owners are buying schedule certainty, so awards are moving to integrated BOP-EPC packages;
credential, with 2 additional BOP EPC projects targeted
the SHANTI Act, 2025 adds nuclear turbine island and BOP to the addressable pipeline.
to be won during the year.
• Utilities and IPPs are outsourcing plant operations through long-term comprehensive O&M, • ₹2,032 Cr of H1 FY27 O&M wins — Athena ₹970 Cr,
Industrial taking the addressable fleet to ~231 GW (~₹15,000 Cr per annum). Butibori ₹266 Cr — all five-year contracts.