Advait Energy Transitions Limited has received a turnkey contract from PASCHIM GUJARAT VIJ COMPANY LTD (PGVCL) worth ₹58.25 crore for converting existing 11 kV HT & LT Line Network into Underground Cable Network at Adhewada (Akwada) Subdivision of Bhavnagar Circle.
Analysis Scores
Earnings Impact6/10
Growth Catalyst7/10
Governance Concern1/10
Regulatory Risk1/10
Balance Sheet Risk2/10
Liquidity Impact8/10
Market Sentiment6/10
✦ Ask a Question
Ask anything about this announcement — AI will answer based on the filing content.
Full Announcement
Advait Energy Transitions Limited has informed the Exchange about Bagging/Receiving of orders/contracts
Attachments (1)
📄pdf
Download →
ADVAITENERGY_10072026133217_SE_intimation_Bhavnagar_LOA_s.pdf
View document text
Date: July 09, 2026
To, To,
General Manager The Manager
Department of Corporate Services Listing Compliance Department
BSE Limited National Stock Exchange of India Limited
Listing Department Exchange Plaza, Plot No. C/1,
Phiroze Jeejeeboy Tower, Dalal Street, G Block, Bandra - Kurla Complex,
Fort Mumbai-400 001 Bandra (East), Mumbai 400 051
Scrip code: 543230 Symbol: ADVAIT
Sub: - Intimation of Order Bagged under SEBI (LODR) Regulations, 2015 –Turnkey Contract for
Conversion of Existing 11 kV HT & LT Line Network into Underground Cable Network at Adhewada
(Akwada)- Bhavnagar Circle Under PGVCL (Package-18)
Dear Sir/ Madam,
Pursuant to the relevant provisions of SEBI (Listing Obligation and Disclosure Requirements) Regulations,
2015, we would like to inform you that our company has received an order in normal course of business, for
Turnkey contract for Site Survey, Designing, Engineering, Procurement, Supply, Loading, Transportation,
Unloading, Insurance, Delivery at Site, Handling, Storage, Installation, Testing, Commissioning Including
Documentation of All Items/Material required to complete works for Turnkey Based Contract For
Conversion of Existing 11 kV HT Line and LT Line Network Including Consumer Service Lines Into Under
Ground Cable Network With Ring Main System at Adhewada (Akwada) Subdivision of Bhavnagar Circle
Under PGVCL with GIS Mapping / Geo Urja Mapping (Developed by GUVNL) and Asset Tagging under SI
Scheme (Package-18) on 9th July 2026.
Also further note that, the details required under SEBI Circular No HO/49/14/14(7)2025-CFD-
POD2/I/3762/2026 dated January 30, 2026, for Corporate Announcement filed under Regulation 30 of SEBI
(LODR) Regulations, 2015 is enclosed herewith.
Kindly take this information on your records and acknowledge the receipt.
Thanking You,
Yours Faithfully,
For Advait Energy Transitions Limited
(Formerly known as Advait Infratech Limited)
Deepa Fernandes
Company Secretary & Compliance Officer
FCS: 13015
Additional Details Required under SEBI Circular for Corporate Announcement filed under Regulation 30
of SEBI (LODR) Regulations, 2015
SR. Particulars Details
Name of the entity awarding
1. PASCHIM GUJARAT VIJ COMPANY LTD (PGVCL)
the order(s)/contract(s)
Turnkey contract for Site Survey, Designing, Engineering, Procurement, Supply,
Loading, Transportation, Unloading, Insurance, Delivery at Site, Handling,
Storage, Installation, Testing, Commissioning Including Documentation of All
Significant terms and
Items/Material required to complete works for Turnkey Based Contract For
conditions of
2. Conversion of Existing 11 kV HT Line and LT Line Network Including Consumer
order(s)/contract(s)
Service Lines Into Under Ground Cable Network With Ring Main System at
awarded in brief
Adhewada (Akwada) Subdivision of Bhavnagar Circle Under PGVCL with GIS
Mapping / Geo Urja Mapping (Developed by GUVNL) and Asset Tagging under
SI Scheme (Package-18).
Whether order(s) /
contract(s) have been
3. Domestic Entity
awarded by domestic/
international entity;
Turnkey contract for Site Survey, Designing, Engineering, Procurement, Supply,
Loading, Transportation, Unloading, Insurance, Delivery at Site, Handling,
Storage, Installation, Testing, Commissioning Including Documentation of All
Items/Material required to complete works for Turnkey Based Contract For
Nature of order(s) /
4. Conversion of Existing 11 kV HT Line and LT Line Network Including Consumer
contract(s)
Service Lines Into Under Ground Cable Network With Ring Main System at
Adhewada (Akwada) Subdivision of Bhavnagar Circle Under PGVCL with GIS
Mapping / Geo Urja Mapping (Developed by GUVNL) and Asset Tagging under
SI Scheme (Package-18).
whether domestic or
5. Domestic
international
time period by which the
6. order(s)/contract(s) is to be 18 Months
executed
broad consideration or size 58,25,31,158.00/-(Fifty Eight Crore Twenty Five Lakh Thirty One Thousand One
of the order(s)/contract(s) Hundred Fifty-Eight Rupees) incl taxes.
Whether the promoter/
promoter group / group
companies have any
interest in the entity that
8. -
awarded the
order(s)/contract(s)? If yes,
nature of interest and
details thereof
Whether the
order(s)/contract(s) would
fall within related party
9. -
transactions? If yes,
whether the same is done at
“arm’s length”.