BSECompany Update1d ago · 4 Sept 2026, 04:21 pm

The Company has informed the exchange about "Temporary shutdown of 60MW Power Plant at Odisha to carry out routine maintenance/ overhauling"

Nava Ltd · 513023

✦ AI SummaryExpansion

Nava Ltd has informed the exchange about a temporary shutdown of one of its 60MW power plants in Odisha for routine maintenance and overhauling, expected to last 55-60 days, with no expected material adverse impact on business operations or performance.

Analysis Scores

Earnings Impact5/10
Growth Catalyst2/10
Governance Concern1/10
Regulatory Risk1/10
Balance Sheet Risk1/10
Liquidity Impact8/10
Market Sentiment5/10

✦ Ask a Question

Ask anything about this announcement — AI will answer based on the filing content.

0/500

Full Announcement

Nava Ltd - 513023 - General Update

Attachments (1)

📄

77fa76f5-5c70-4cb0-ad34-e3d35db1a052.pdf

pdf

Download →
View document text
NAVA LIMITED NAVA/SECTL/188/2026-27 September 04, 2026 Listing Department Dept. of Corp. Services National Stock Exchange of India Limited BSE Limited Exchange Plaza, 5th Floor, Phiroze Jeejeebhoy Towers, Plot No.C/1, G Block Dalal Street Bandra Kurla Complex, Bandra (E) MUMBAI – 400 001 MUMBAI – 400 051 NSE Symbol: ‘NAVA’ Scrip Code: ‘513023’ / ‘NAVA’ Dear Sir/ Madam, Sub: Intimation of Temporary Shutdown of 60 MW Power Plant at Odisha to carry out routine maintenance / overhauling Ref: Reg. 30 of SEBI (Listing Obligations and Disclosure Requirements) Regulations We wish to inform you that the Company’s energy operations in the State of Odisha comprise three generating units with an aggregate capacity of 150 MW, consisting of Two 60 MW IPP Units and One 30 MW CPP Unit. In accordance with the recommendations of the Original Equipment Manufacturer (OEM) and prevailing industry best practices, the Company has planned a temporary shutdown of “One of its 60 MW IPP Units” commencing from September 06, 2026, to undertake routine inspection, maintenance and overhauling activities in compliance with applicable safety and regulatory requirements. The shutdown is expected to continue for about 55 to 60 days and is scheduled during a period of relatively lower thermal power production requirements due to greater availability of hydel power and consequent lower tariffs. Accordingly, the Company does not expect any material adverse impact on its business operations or overall performance on account of this shutdown. The Company will keep the Stock Exchanges informed of any material developments and will promptly intimate the Stock Exchanges upon resumption of operations. This is for your information and records. Thanking you. For Nava Limited VSN Raju Company Secretary & Vice President Regd. Off.: Nava Bharat Chambers, 6-3-1109/1, 3rd Floor, Raj Bhavan Road, Somajiguda, Hyderabad - 500 082, Telangana, India. CIN: L27101TG1972PLC001549 T +91 40 40345999, +91 40 23403501 E nava@navalimited.com; investorservices@navalimited.com W www.navalimited.com ISO 9001 | ISO 14001 | ISO 45001 | ISO 50001