BSEOthers3d ago · 2 Sept 2026, 08:44 pm
Submission of 33rd Annual Report for the financial year 2025-26 under Regulation 34(1) of SEBI (Listing Obligations and Disclosure Requirements) Regulations 2015
Ashoka Buildcon Ltd · 533271
✦ AI SummaryResults
Ashoka Buildcon Ltd has submitted its 33rd Annual Report for the financial year 2025-26, along with the Business Responsibility and Sustainability Report (BRSR) and Notice of Annual General Meeting (AGM). The AGM will be held on September 25, 2026, through video conferencing.
Analysis Scores
Earnings Impact5/10
Growth Catalyst3/10
Governance Concern2/10
Regulatory Risk1/10
Balance Sheet Risk4/10
Liquidity Impact6/10
Market Sentiment5/10
✦ Ask a Question
Ask anything about this announcement — AI will answer based on the filing content.
Full Announcement
Ashoka Buildcon Ltd - 533271 - Reg. 34 (1) Annual Report.
Attachments (1)
📄pdf
Download →
108ab479-291c-4200-b846-fa318adcd757.pdf
View document text
Ashoka Buildcon Limited
September 02, 2026
To To
The Manager The Manager
The Departent of Corporate Services The Listing Departent
BSE Liited National Stock Exchange of India Liited
Floor 25, P. J. Toers, Exchange Plaza, Bandra Kurla Coplex,
Dalal Street, Muai – 400 001 Bandra (East), Muai – 400 051
Scrip Code: 533271 Scrip Symbol: ASHOKA EQ.
Debt Codes: CPs -730851/731112/731487/732069/732127
Dear Sir / Mada,
Sub.: Submission of 33rd Annual Report for the financial year 2025-26 under Regulation 34(1) of
SEBI (Listing Obligations and Disclosure Requirements) Regulations 2015
With reference to the captioned suject, e are suitting hereith the 33rd Annual Report of the
Copany along ith Business Responsiility and Sustainaility Report (BRSR) and Notice of Annual
General Meeting (AGM) for the financial year 2025-26, hich is eing sent to the shareholders y
electronic ode ho have registered their e-ail addresses ith the depositories.
The 33rd Annual General Meeting (AGM) of the Copany ill e held on Friday, Septeer 25,
2026 at 12:30 p.. through Video Conferencing/ Other Audio Visual eans (VC/OAVM).
Pursuant to Section 108 of the Copanies Act, 2013 read ith Rule 20 of the Copanies
(Manageent and Adinistration) Rules, 2014 and Regulation 44 of the SEBI (Listing Oligations
and Disclosure Requireents) Regulations, 2015, the Copany is pleased to provide its eers
ith the reote e-voting facility to cast their votes electronically on the resolutions entioned in
the AGM Notice using the electronic voting platfor provided y MUFG Intie India Private
Liited (MUFG). The voting rights of eers shall e in proportion to the shares held y the,
as on the cut-off date i.e. Friday, Septeer 18, 2026.
The reote e-voting period coences on Tuesday, Septeer 22, 2026 at 09:00 a.. and ends
on Thursday, Septeer 24 2026 at 05:00 p.. The reote e-voting odule shall e disaled y
MUFG for voting thereafter. In addition, the facility for voting through electronic voting syste
shall also e ade availale at the AGM and the eers participating in AGM through
VC/OAVM, ho have not cast their votes y reote e-voting, shall e ale to exercise their rights
during the eeting.
Regd. Office: S. No. 861, Ashoka House, Ashoka Marg, Vadala, Nasik – 422 011, Maharashtra, India
Tel. + 91 253 6633705 Fax +91 253 2236704 .ashokauildcon.co
CIN: L45200MH1993PLC071970
Ashoka Buildcon Limited
The Annual Report containing the AGM Notice for FY 2025-26 is also uploaded on the esite of
the Copany viz. .ashokauildcon.co at
https://www.ashokabuildcon.com/files/investors/financial-info/ABL_AR_FY_25-26.pdf
Please take the sae on your records.
Thanking you,
Yours faithfully
for ASHOKA BUILDCON LIMITED
(Manoj A. Kulkarni)
Copany Secretary
ICSI M. No. FCS – 7377
Encl.: As aove
Regd. Office: S. No. 861, Ashoka House, Ashoka Marg, Vadala, Nasik – 422 011, Maharashtra, India
Tel. + 91 253 6633705 Fax +91 253 2236704 .ashokauildcon.co
CIN: L45200MH1993PLC071970
Ashoka Buildcon Limited
creating
landmarks
Annual Report
2025-26
Building Landmarks Today
That Empower The Future
BUILDING LANDMARKS TODAY THAT EMPOWER THE FUTURE
At Ashoka Buildcon, every project we landmark should be.
build is more than infrastructure — it is
a landmark that denes the future of These are not projects we simply
the ground it stands on. complete; they are milestones that
contribute to Ashoka's evolution from a
Our journey has been shaped by regional highway builder into a turnkey
landmark engineering: from EPC contractor, with the capability of
highways and expressways to constructing challenging projects.
record-breaking bridges, power, rail,
buildings, tunnel electrication, smart Beyond engineering excellence, we
infrastructure, solar, water, airports, continue to drive value through
and international frontiers. nancial prudence, digital project
controls, sustainability, and
This philosophy is reected in projects community engagement.
currently under construction across the
country and beyond, including the Strengthening our balance sheet,
Aroor–Thuravoor Elevated Highway, the embedding safety across every site,
iconic cable-stayed bridges along the investing in our people, and uplifting
Konkan coast, and the Diriyah II One the communities we build in, remain
Hotel project in Saudi Arabia. at the heart of our purpose.
Ashoka Buildcon Limited
Each project, however complex the As we move forward, we reafrm our
terrain or technology, has strengthened commitment to build world-class
our ability to execute with precision and infrastructure — one landmark at a
Ashoka Buildcon Limited
embrace complexity, while raising the time.
industry’s benchmark for what a
Annual Report
2025-26
MAJOR PROJECTS
Stilt Bridge SBR-9, Eastern Connectivity - Maharashtra
Raised on stilts over tidal creek terrain and delivered on time — the eastern gateway to Navi Mumbai
International Airport
Aroor-Thuravoor 6-Lane Elevated Corridor (12.752 kms.) - Kerala Khammam Cable-Stayed Bridge - Telangana
India's longest continuous elevated road yover — built with stainless steel reinforcement — One of Telangana's iconic pure cable-stayed bridges — opening up a century-old choke point
threaded through the dense heart of Kochi on the road connecting to Andhra Pradesh
Annual Report
2025-26
MAJOR PROJECTS
Dharam Katra J&K Tunnel Electrication Project Commissioning of ‘Kavach’ (251 RKM)
Electrical & Mechanical systems delivered inside the mountain tunnels of Jammu & Kashmir India's indigenous Automatic Train System — safety engineered directly into the running track
947.59 TKM of Railway Electrication Work - Assam
150 MW Chhattargarh Solar PV Project for NTPC - Rajasthan
Electrifying Northeast Frontier Railway as EPC contractor — across the Rangiya & Tinsukia divisions
Clean power harvested from Bikaner desert — a utility-scale milestone in Ashoka's Power portfolio
Annual Report
2025-26
MAJOR PROJECTS
Artistic Impression Artistic Impression
Bankot Cable-Stayed Bridge - Maharashtra Kundalika Cable-Stayed Bridge - Maharashtra
A cable-stayed landmark where the Savitri meets the Arabian Sea — clearing 30 metres An iconic cable-stayed crossing on the Konkan coast, near the Alibaug Beach linking Revdanda
for the vessels that pass underneath improving connectivity to Harihareshwar Beach to Salav across Kundalika Creek
Artistic Impression
Artistic Impression
Jaigad Cable-Stayed Bridge - Maharashtra Gaimukh-Payegaon Creek Bridge - Maharashtra
Crossing Jaigad Creek with a 40-metre navigational clearance, improving connectivity to Easing the pressure on Thane's Ghodbunder corridor — an elevated crossing of the Ulhas
Ganapatipule Beach river with a 120-metre navigation span
Annual Report
2025-26
MAJOR PROJECTS
Artistic Impression Artistic Impression
Signature Bridge - Daman Elevated Western Crosseld Taxiways - Karnataka
Daman's new visual signature on the NAMO Path — architectural distinction anchored on deep, Banyan-shaped piers carrying A380 aircraft above a live international airport — with
scour-resistant foundations 3.5 MW of solar built into the structure
Artistic Impression
Artistic Impression
Sion–Panvel Highway Flyover, Arm-1 & Arm-2 – Mumbai (M/E Ward) Diriyah II One Hotel project in Riyadh - Saudi Arabia
New arms grafted onto a live Sion–Panvel crossing without halting a lane — with stainless Ashoka's landmark-building reaches the Gulf — a luxury hospitality development rising at
steel deck Diriyah, northwest of Riyadh
Annual Report
2025-26
NUMBERS AT A GLANCE ORDER BOOK
TURNOVER (Rs. Crores) 50+
SEGMENT BREAKUP YEARS
Consolidated
of experience in
10,205 construc on industry
10,005
Road EPC
8,235 7703 Road HAM 30.2%
6,147
Building EPC 46.3%
FY 26
Railways
7,703 9.3%
Power T&D
3.7% Rs. 15,312 Crs.
Rs. Crores 10.6%
Order Book as on
FY 22 FY 23 FY 24 FY 25 FY 26 31 March 2026
REGION BREAKUP
PBT (Rs. Crores)
excluding exceptional items
Consolidated 0.5%
North 9.3% 6.9% 10,000+
[Showing first 8,000 characters — download PDF for full document]