NSECopy of Newspaper Publication3d ago · 2 Sept 2026, 03:47 pm
Copy of Newspaper Publication
ATLANTAA LIMITED · ATLANTAA
✦ AI Summary
Atlantaa Limited has announced the 43rd Annual General Meeting (AGM) to be held on September 29, 2026, through video conference or other audio-visual means.
Analysis Scores
Earnings Impact1/10
Growth Catalyst1/10
Governance Concern1/10
Regulatory Risk1/10
Balance Sheet Risk1/10
Liquidity Impact1/10
Market Sentiment1/10
✦ Ask a Question
Ask anything about this announcement — AI will answer based on the filing content.
Full Announcement
Newspaper Advertisement-Information regarding 43rd (Forty-Third) Annual General Meeting of the Company
Attachments (1)
📄pdf
Download →
ATLANTA_02092026154635_Final.pdf
View document text
.,o ATLANTAA LIMITED
(Formerly Known as Atlanta Limited)
An ISO 9001:2015 Company
501, Supreme Chambers, Off Veera Desai Road,
e p Andheri (West), Mumb—a 4i00 053.
¢ witn Phone : +91-22-698911(4140 Lines)
E-Mail : mail@atlantaalimited.in | Website : www.atlantaalimited.com
CIN : L64200MH1984PLC031852
Date: September 02, 2026
To, To,
Corporate Service Department Corporate Service Department
The Bombay Stock Exchange limited National Stock Exchange of India Ltd.
P.]. Towers, 15t Floor, Exchange Plaza,
Dalal Street, Bandra-Kurla Complex,
Mumbai 400 001 Bandra (E)
Scrip Code: 532759 Mumbai - 400 051.
Trading Symbol: ATLANTAA
Sul of N ublish: newspaj 34 Annual General ing of mpan
to be held on Tuesday, September 29, 2026 through Video Conference (‘'VC’) / Other Audio-
Visual Means (‘OAVM’.
Dear Sir(s)/ Madam(s)
Pursuant to Regulation 30 of the Securities Exchange Board of India (Listing Obligations and
Disclosure Requirements) Regulations, 2015 and in compliance with the General Circular No.
09/2024 dated September 19, 2024 and various circulars issued in this regard by the Ministry of
Corporate Affairs (‘MCA”) from time to time, we hereby enclose copies of the Newspaper
Advertisements for the attention of the Members, in respect of information regarding 43 Annual
General Meeting of the Company scheduled to be held on Tuesday, September 29, 2026 at 01.00
pm (IST) through VC/OAVM, published in the newspapers on Wednesday, September 02, 2026
The above intimation is also available on the website of the Company at www.atlantaalimited.in
Request you to take the same on your record.
Thanking you.
Yours faithfully,
For Atlantaa Limited
rickiin ggives
bbarot 153
Rickiin Bbarot
Managing Director
DIN: 02270324
mumbai
www.freepressjournalin
Mumbai, Wednesday, September 2, 2026
150 crore Metro 6 ops sans full-fledged depot Mother of 4 found
infra park in
Navi Mumbai dead in lift shaft
Will adopt interim pit-line system; land transfer proposal for carshed pending with Centre
FPJNews Service
MUMBAI Sweety Bhagwat ridor is being developed as a Redevelopment Project proponent have proposed Bhiwandi civic body says bldg illegal
JOINT FLYOVER
fully elevated line. The pit (DRP). As per the letter, the reallocating land ~ from
MUMBAI
Business infrastructure aimed line is being developed at the Centre had earlier approved Shepherd Salt Works and As part of the project,a | Danlsh Azml lift's condition, its operation
at multinational occupiers is The proposed Metro 6 Vikhroli end. MMRDA has 197.4 acres of salt pan land Battiwala Salt Works. 2.58km combined road | BHWANDI and the circumstances sur-
set to come up on a four-acre (Swami Samarth Nagar- sought salt pan land in from Arthur and Jenkins Salt Metro 6 is expected to flyover and Metro rounditnhge incident to deter-
prime land parcel on Thane- Vikhroli) will commence Kanjurmarg for depot con- ‘Works to the Maharashtra become an important east- structure is also under A 54-year-old widow, who mine how Shaikh fell.
Belapur Road in Navi operations without its full- struction but the proposal is government for the DRP. west public transport link, construction between was the sole breadwinner for Bhoiwada police sent her body
Mumbai, with a Navi Mumbai- fledged car shed, with the pending with the Centre. However, MMRDA has since connecting the Western and Swami Samarth Nagar her four children, was found to Indira Gandhi Memorial
based developer planning a Mumbai Metropolitan For the land transfer, the requisitioned 22 hectares Eastern Express highways and Mahakali in Andheri dead beneath the lift of a Hospital, Bhiwandi, for a post-
Grade-A commercial park at Region Development state housing department (54.36 acres) from Arthur through Jogeshwari, Easton JVLR. The seven-storey unauthorised mortem examination.
the site. Authority (MMRDA) using a wrote to the secretary, Salt Works for a Metro car Jogeshwari-Vikhroli ~ Link structure will run on building, Rabia Apartment, in Police inspector Deepak
Kamdhenu Realities has pit-line facility for routine Ministry of commerce and shed, reducitnhge area orig- Road (JVLR) and Powai. The the same single plers the Dhobi Talo area of Jadhav said an accidental
acquired the land from RPG inspection and maintenance, industry, seeking approval inally earmarked for the line will have 13 stations, with along the road median Bhiwandi on Tuesday. The death report has been regis-
Life Sciences in a deal valued similar to Metro Line 4 con- for amendments to the land redevelopment project. To much of its alignment andls bolng developed | deceased, Shalicen Shaikh, is tered and a post-mortem
at around 150 crore, making struction. title survey numbers and retain the total approved planned along the median of the BMC suspected to have fallen into report is awaited. The inci-
it one of the largest commer- The 15.31-km Matro 6 cor- area linked to the Dharavi area, the DRP and project the JVLR. the lift shaft while returning dent has also raised safety
cial land deals on the corridor home after work, though the concerns about the building.
this year. The plot is located Arvind Ghughare, assistant
exact circumstances remain
near IKEA and opposite the II'T-B advice sought to cover Monorail guideway gaps unclear. commissioner and ward No 4
upcoming Pawane railway sta- Shaikh worked as domestic in-charge, said a notice would
tion, and has a development help and had been missing be issued to the building
potential of 18 million sq ft. since Monday night. Her owner seeking an explana-
The proposed commercial FPJ News Service dation is aimed at address- around 10 minutes or longer Metro and suburban railway family searched for her tion. Authorities will also
park will comprise corporate MUMBAI ing both passenger rescue depending on traffic and systems, ~where trains among relatives, acquaint- examine whether the lift had
offices, high-street retail and concerns and safety risks other road conditions. receive electricity through ances and in nearby arcas a technical defect, whether it
F&B avenues.Itis also planned The Mumbai Metropolitan along the Monorail corridor. The need to cover the overhead wires or other before lodging a missing-per- was properly maintained and
to feature double-height Region Development The gaps between the paral- gaps is also linked to the fixed electrical systems, the son complaint. ‘what condition it was in when
lobbies. Authority (MMRDA) has lel guideways are being Monorails alignment, which Monorail ~draws power Police are examining the the incident occurred.
Thane-Belapur Road, once sought expert advice from examined as part of includes sharp curves. through its guideways.
an industrial belt, has IIT-Bombay on measures to arrangements to rescue Officials said an object fall- Officials said this means a
emerged as Navi Mumbai’s cover the gaps between the passengers if a rake ing through a gap onto the standby rake operating on
main corporate corridor, with two elevated guideways of becomes stranded between busy road below could pose the adjacent guideway may ‘BMC must audit land
I ceT n tp ra er sk as n, d g al co lb ua sl t erc oa fp a hb yi pl ei rt -y t bh ee fo re M seu rm vib ca ei s can rM eo sn uo mr eai .l sta Ot fi fo in cs i. a ls said stations wr ho iu lg eh ly r eaa chk ii nl go me at r se t ra ap na dr et d, pa eder si tsk r iat no s . motorists and n co ut e p aro rv ri ad ne g ean m ea nd te qu ina te e vr ee rs y- for sanitation staff hsg’
scale data centres. The technical recommen- along the corridor are rake by road could take Unlike conventional emergency situation.
Urvl Mahajani
workers.
MUMBAI The court noted with con-
Transport hub blast work: cern that while large tracts of
The Bombay High Court has public land have vanished
directed the BMC to thor- from the municipal pool
Shelar wants public hearing oughly examine its land hold- through slum encroach-
ings and submit a detailed ments and handovers to pri-
report on properties that can vate developers, the BM
[Showing first 8,000 characters — download PDF for full document]